background image

35

Subject to change without notice  |  83059100fUK – Translation of the original operating manual |  ait-deutschland GmbH

Legend hydraulic diagramm

140304

1

Heat pump

51

Seperation tank

TA/

A

External sensor

2

Underfloor heating / radiators

52

Gas- or oil-boiler

TBW/B

Domestic hot water sensor

3

Vibration isolation

53

Wood boiler

TB1/C

Feedwater sensor mixer circuits 1

4

Sylomer strip machine underlay

54

Hot water cylinder

D

Floor tmperature limiter

5

Closure and drainage

55

Brine pressure switch

TRL/G

Sensor external return

6

Expansion vessel packing list

56

Swimming pool heat exchanger

ST

A

Line pressure regulator valve

7

Safety valve

57

Geothermal heat exchanger

TRL/H

Sensor return 

(h

ydraulic module, dual

)

8

Closure 

58

Ventilation system

9

Heating circulation pump

59

Plate heat exchanger

79

Motor valve

10

Non return valve/ one way valve

61

Cooling cylinder

80

Mixin

g valve

11

Individual room regulation

65

Compact distributor

81

Sp

lit heat 

pum

p outdoor unit

12

Overflow valve

66

Fancoils

82

Sp

lit heat 

pum

p indoor unit 

13

Steamtight insulation

67

Solar/ service water cylinder

83

Circulation

pum

p

14

Service water circulation pump

68

Solar/ service water cylinder

84

Switchin

g valve

15

Mixer circuit three-way mixer (MK1 discharge)

69

Multifunction tank

113

Connection 2nd heat generator    

16

Expansion vessel supplied by customer

71

Dual hydraulic module

BT1

Outdoor tem

perature sensor

18

Heating rod (heating)

72

Buffer tank wall mounted

BT2

Flow tem

perature sensor 

19

Mixer circuit four-way mixer (MK1 charge)

73

Pipe lead-in

BT3

Return tem

perature sensor

20

Heating rod (SW)

74

Ventower

BT6

Domestic hot water tem

perature sensor

21

Mixer circuit circulation pump (FP1)

75

Scope of delivery, hydraulic tower, dual

BT12

Flow tem

perature li

quefier

23

Feed circulating pump (reconnect the integrated circulating pump  in the heat pump)

76

Fresh water station

BT19

Temperature sensor immersion heater                 

24

Manifuld

77

Scope of supply water/water booster

BT24

Tem

perature sensor 2nd heat 

generator

25

Heating circulation pump

78

Accessories water/water booster optional

26

 

Sw

itching v

alv

e (heating/serv

ice w

ater)(B

 = normally

 open)

27

Heating element

28

Brine circulation pump

Comfort board:

29

Dirt-trap 0.6 mm mesh

15

Mixer circuit three-wa

y mixer 

(MK2-3 dischar

ge

)

30

Spill-tray für brine mix

100

Room thermostat for cooling (optional)

17

Temperature difference regulator

31

Wall breakthrough

101

Controls supplied by customer

19

Mixer circuit four-way mixer (MK2 charge)

32

Inlet pipe

102

Dew-point monitor (optional)

21

Mixer circuit circulation pump (FP2-3)

33

Brine manifuld

103

Room thermostat for reference space in packing list

22

Swimming pool circulating pump

34

Ground collector

104

Supply heat pump

44

Three-way mixer valve (cooling function MK2)

35

Ground slinkies

105

Cooling circuit module box removeable for installation

47

 

C

hangeov

er v

alv

e sw

imming bath preparation(B

 = normally

 open)

36

Groundwater spring pump

106

Specific glycole mixture

60

C

hangeov

er v

alv

e cooling operation(B

 = normally

 open)

37

Wall bracket

107

Scald protection / thermostatic mixer valve

62

Heat meter (optional)

38

Flow switch

108

Solar pump assembly

63

C

hangeov

er v

alv

e solar circuit(B

 = normally

 open)

39

Suction well

109

Overflow valve must be closed

64

Cooling circulation pump

40

Inverted well

110

Packing list hydraulic tower

70

Solar seperation module

41

Rinse fitting heating circuit

111

Mounting for additional heating element

TB2-3/C

Feedwater sensor mixer circuits 2-3

42

Circulation pump

112

Minimum distance to thermal decoupling of the mixing valve

TSS/E

Sensor, temperature difference control (low

 temperature)

43

Brine / Water heat exchanger (cooling function)

TSK/E

Sensor, temperature difference control (high temperature)

44

Three-way mixer valve (cooling function MK1)

TEE/F

Sensor external energy source

45

Cap valve

46

Filler and drainage valve

48

Domestic hot water charging pump

49

Direction of groundwater flow

50

Buffer storage

Important notice !

These hydraulic diagrams are schematic representations and are for assistance only. They do not relieve of the obligation to ca

rry out appropriate planning! They do not include all necessary shut-off valves, ventilator 

fittings or safety devices. These must be incorporated in accordance with the standards and regulations applicable to the respe

ctive installation. All country-specific standards, laws and regulations must be observed! The 

tubes have to be dimensioned according to the nominal volume flow of the heat pump resp. the free pressing of the integrated ci

rculating pump. For detailed information and advice please contact our local sales partner!

Summary of Contents for LWV 122R3

Page 1: ...UK 83059100fUK Translation of the original operating manual Air water heat pumps Operating Manual LWV ll I...

Page 2: ...tallation of air ducting 11 5 6 Attach side walls rear wall and cover 11 6 Hydraulic installation 11 7 Electrical installation 12 8 Flushing filling and venting 13 8 1 Heating water quality 13 8 2 Flu...

Page 3: ...ration Operating manual of the heating and heat pump controller Brief description of the heat pump controller Operating manual of the expansion board accessories Log book 1 3 Symbols and markings Iden...

Page 4: ...rence by unqualified personnel can cause life threatening injuries and damage to property Ensure that the personnel is familiar with the local regulations especially those on safe and hazard aware wor...

Page 5: ...ms Proper planning design and commissioning Closed system with regard to corrosion Integration of an adequately dimensioned pressure maintaining device Use of demineralised heating water VE water or V...

Page 6: ...nal installation site 7 Lashing straps with grip openings 8 Wooden strip fan support 3 2 Layout NOTE This section essentially names the components relevant for fulfilling the tasks described in this o...

Page 7: ...by the heat pump controller Reheating drying out screed or increasing the domestic hot water temperature can be carried out using an electric heating element which is activated by the heat pump contro...

Page 8: ...aging material in an environmentally friendly way and in accordance with local regulations 3 Remove the film from the plastic element of the front panel in the place of installation Lift the housing w...

Page 9: ...evaporator module NOTE The evaporator module can be disconnected from the refrigerant circuit module if required This work must be carried out by the factory customer service department Please contac...

Page 10: ...unt If several heat pumps of different types are installed only the heat pump with the largest refrigerant volume needs to be taken into account 9 9 Minimum volume corresponds to the requirements for...

Page 11: ...ight or left Left air discharge Right air discharge 4 3 2 1 Air duct installation instructions Wall duct installation instructions 5 6 Attach side walls rear wall and cover Heat pump installation inst...

Page 12: ...and regulations Discharging the condensate and the safety valve outlet into the sewers is only permitted via a funnel waste trap which must be accessible at all times 1 Fit an HT bend onto the conden...

Page 13: ...o the VDI Guidelines 2035 Vermeidung von Sch den in Warmwasserheizanlagen preventing damage in hot water heating systems Required pH value 8 2 10 for aluminium materials pH value 8 2 8 5 Fill the syst...

Page 14: ...it to the left to reduce it 9 9 System is running in heating mode ideally in cold condition The IBN assistant already provides the option in the event of the integration of the storage tank in series...

Page 15: ...tion for heat pump systems and general checklist to the manufacturer s local partner 4 Arrange for the heat pump system to be com missioned by the manufacturer s authorised after sales service for a f...

Page 16: ...with chemical cleaning product neutralise any residues and flush the condenser thoroughly with water 12 4 Yearly maintenance Record the quality of the heating water analytically In case of deviations...

Page 17: ...sioning I Min volume buffer tank in series I Min volume separation buffer tank l h l l 1200 60 100 1900 100 200 Free pressing Pressure loss Flow rate bar bar l h 0 14 1200 0 2 1900 Max allowable opera...

Page 18: ...temperature pmax max free pressing Qh min max min max heating power Pel min max min max power consumption 823290b 0 1 2 3 4 5 6 7 8 9 10 25 20 15 10 5 0 5 10 15 20 25 30 35 Temp C Qh min max kW 35 C...

Page 19: ...ooling water temperature pmax max free pressing Q0 min max min max cooling capacity Pel min max min max power consumption 823290b 0 1 2 3 4 5 6 7 8 9 10 10 15 20 25 30 35 40 45 TempWS C Q0 min max kW...

Page 20: ...pmax max free pressing Qh min max min max heating power Pel min max min max power consumption 823291b 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 25 20 15 10 5 0 5 10 15 20 25 30 35 Temp C Qh min max kW 35 C 5...

Page 21: ...water temperature pmax max free pressing Q0 min max min max cooling capacity Pel min max min max power consumption 823291b 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 10 15 20 25 30 35 40 45 TempWS C Q0 min ma...

Page 22: ...40 2 Trinkwarmwasser Austritt Vorlauf G 1 Au engewinde G 5 4 Au engewinde 3 Trinkwarmwasser Eintritt R cklauf G 1 Au engewinde G 5 4 Au engewinde 4 3 2 1 A B C D E F 4 3 2 1 Zust Schutzvermerk ISO 16...

Page 23: ...mpenmodul Seitenansicht von links A2 Ventilatormodul Vorderansicht B2 Ventilatormodul Seitenansicht von links 4 3 2 1 A B C D E F 4 3 2 1 Schutzvermerk ISO 16016 beachten LWV Dimensonal drawing 2 Keys...

Page 24: ...OKF Top edge of the finished floor FA Finished external fa ade LR Air direction BS Control side FWS Finished wall thickness KA Condensate drain G Cut Installation in the light well Pos Name Dim B1 If...

Page 25: ...Top edge of the finished floor FA Finished external fa ade LR Air direction BS Control side FWS Finished wall thickness KA Condensate drain G Cut Installation in the light well Pos Name Dim B1 If fin...

Page 26: ...Kondensatablauf G Schnitt Einbau im Lichtschacht Achtung Platz f r funktionsnotwendiges Zubeh r beachten 4 3 2 1 4 3 2 1 Zust nderu PEP 01 Installation plan V3 Keys UK819471 All dimensions in mm V3 Ve...

Page 27: ...auf G Schnitt Einbau im Lichtschacht Achtung Platz f r funktionsnotwendiges Zubeh r beachten A B C D E F 4 3 2 1 Zust Schutzvermerk ISO 16016 beachten Installation plan 4 Keys UK819471 All dimensions...

Page 28: ...sions in mm V5 Version 5 OKF Top edge of the finished floor FA Finished external fa ade LR Air direction BS Control side FWS Finished wall thickness KA Condensate drain G Cut Installation in the light...

Page 29: ...sions in mm V6 Version 6 OKF Top edge of the finished floor FA Finished external fa ade LR Air direction BS Control side FWS Finished wall thickness KA Condensate drain G Cut Installation in the light...

Page 30: ...zgitter 845x850 Bauseits Lichtschacht mit Wasserablauf min freier Querschnitt 0 6m2 Mindestabst nde Wenn Abst nde bis auf das Mindestma reduziert werden muss man die Luftkan le eink rzen Bezeichnung Z...

Page 31: ...itter 845x850 Bauseits Lichtschacht mit Wasserablauf min freier Querschnitt 0 6m2 Mindestabst nde Wenn Abst nde bis auf das Mindestma reduziert werden muss man die Luftkan le eink rzen Bezeichnung Zub...

Page 32: ...ce 83059100fUK Translation of the original operating manual ait deutschland GmbH 1 104 3 3 T 102 T 100 2 66 11 D 101 12 M 24 7 25 HUP 54 50 75 111 26 BUP A B 46 5 8 8 B TBW ZWE 46 5 46 62 12 8371223 8...

Page 33: ...on of the original operating manual ait deutschland GmbH 54 B TBW 111 8 8 B A 26 BUP 8 8 1 104 3 3 ZWE 6 M 24 7 5 8 46 71 38 62 23 ZUP T 102 T 100 2 66 11 D 101 H TRL 5 12 12 8 8 50 111 8371226 IBN 83...

Page 34: ...riginal operating manual ait deutschland GmbH 66 11 8 8 8 10 9 HUP D 101 T 102 T 100 2 66 11 8 8 8 10 21 FP1 C TB1 15 MK1 D 101 T 102 T 100 54 B TBW 111 8 8 8 8 B A 26 BUP 18 ZWE 61 G TRL 111 8 10 23...

Page 35: ...0 6 mm mesh 15 Mixer circuit three way mixer MK2 3 discharge 30 Spill tray f r brine mix 100 Room thermostat for cooling optional 17 Temperature difference regulator 31 Wall breakthrough 101 Controls...

Page 36: ...r supply ventilator 817440a BP1 F2 BP1 BP2 F1 BP2 BP Q10 R20 C1 X10 X100 1 N PE 230V 50Hz F6 X400 1 G1 X300 1 2 3 4 5 6 7 8 A B C D E F A B C D E F Blatt Bl 1 2 AIT 817440 Stromlaufplan ait deutschlan...

Page 37: ...K23 X8 R1 R3 R4 R5 XE R6 B10 X15 B11 1 2 3 4 5 6 7 8 1 2 8 A B C D E F A B C D E F Blatt Bl 2 2 3 4 5 6 7 AIT 817440 Stromlaufplan ait deutschland GmbH PEP M 017 2018 22 09 2016 13 04 2018 AP AP z21...

Page 38: ...or 817441 BP1 F2 BP1 BP2 F1 BP2 Q10 RF1 X10 X100 3 N PE 400V 50Hz F6 X400 1 G1 X300 1 2 3 4 5 6 7 8 A B C D E F A B C D E F Blatt Bl 1 2 AIT 817441 Stromlaufplan ait deutschland GmbH PEP 22 09 2016 AP...

Page 39: ...21 X17 K22 X18 K23 X8 R1 R3 R4 R5 XE R6 B10 X15 B11 1 2 3 4 5 6 7 8 1 2 8 A B C D E F A B C D E F Blatt Bl 2 2 3 4 5 6 7 AIT 817441 Stromlaufplan ait deutschland GmbH PEP 22 09 2016 AP Mod A Ven 1 B8...

Page 40: ...40 Subject to change without notice 83059100fUK Translation of the original operating manual ait deutschland GmbH...

Page 41: ...41 Subject to change without notice 83059100fUK Translation of the original operating manual ait deutschland GmbH...

Page 42: ...42 Subject to change without notice 83059100fUK Translation of the original operating manual ait deutschland GmbH...

Page 43: ...60335 1 2 40 EN ISO 13857 EN 61000 3 2 3 3 EN ISO 12100 1 2 EN 55014 1 2 Company Place date Signature Designated position T V S D Industrie Service GmbH Nr 0036 EC Directives 2014 68 EU Designation o...

Page 44: ...ait deutschland GmbH Industriestra e 3 D 95359 Kasendorf Germany E info alpha innotec de W www alpha innotec de alpha innotec an ait deutschland GmbH brand UK...

Reviews: