12
Subject to change without notice | 83054200iUK | ait-deutschland GmbH
5. Return top cover to frame.
6. Suspend upper facing panels in the top cover.
Bolt to the frame at bottom.
The air flow baffles are now installed. You can now
carry out mounting and installation work on the
unit, and afterwards attach the lower facing pan
-
els. (see “Electrical connection work”, “Heat pump
side connection of control and sensor wires”, 6).
4. Install air flow baffles.
IMPORTANT
Remove the protective sheeting from the air
flow baffles before installation
4.1. Suspend air flow baffles on the brass bushings on
the top side of the frame.
1 eyelet on air flow baffle
2 brass bushing on frame
4.2. Bolt air flow baffles to the frame on the switch box
side and water connection side.