6.3.1. Setup in on-grid mode
Figure 6-3 Address setting interface
A. Press "SET" to enter the programming interface;
B. Enter the password 0001 and press "Enter";
C. See "BUS1" and press "Enter";
D. See "Addr" and press "Enter" ;
E. Use the up and down buttons to set the meter address.If the system is in the AC
mode or Hybrid mode, the grid side meter is "001" and the PV inverter side meter is
"002";If the system is in the DC mode,only need set the grid side meter as "001" ,the
interface is shown below:
F. Press "SET" to enter the "SYS" interface;
G. Press "SET" to enter "SAVE", press "Enter" to select "Yes" to save;
H. The setting is over;
001
EMERGENCY STOP
INSTALLATION
24
25
Emergency Stop
07
When the energy storage system is abnormal, you can press the emergency stop button
"EPO" on the cabinet door, and then follow the step A to E in 4.3 to power it off.
In order to prevent personal casualty, if you want to repair or open the machine after
power-off, please measure the voltage at the input port with the multimeter first. Before
any relevant operation, please confirm that there is no grid electric supply!
The upper cover plate cannot be opened until the DClink capacitance inside the module
discharging completely for about 15 minutes (see warning label on the surface of module
for details).