___________________________________________________________________
Alpha ESS Co., Ltd.
Page 11 of 40
Your Smart Energy
Sites with a potentially explosive atmosphere.
Installation wall load must be more than 180 kg
2.2
Installation
Figure 8 Unpacking the inverter and battery
Step 1
: Remove the battery and inverter from the packaging box.
Figure 9 Battery with Lid off - Front View
Figure 10 Battery with Lid off – Side View
Step 2:
Open battery housing case and remove communication wiring baffle at
the left side.
Communication
wiring baffle