background image

Figure 19 Fixing the Rear Bracket of HV50056

Figure 21 Installation of the Bracket A of the Inverter

Figure 22 Installation of the HV50056 and the Inverter

Figure 20 Fixing of the Rear Bracket of HV50056

Step 7    

 Fix the HV50056 rear bracket as shown in Figure 16.

Find the positioning point and mark it.

2

 Use the impact drill (drill φ10.0mm, length 20cm) to directly drill the hole in the marking position 

of HV50056 rear bracket, the depth of the drilled hole should be 7cm.

3

 After the drilling is completed, insert the expansion tube into the drilled hole, and fix the rear 

bracket with a 10mm self-tapping screw by using 10MM sleeve (SW10).

4

 Fix the HV50056 box rear bracket with the flange nut and use a 7MM sleeve on the two L-shaped 

brackets of the battery (SW7).

Step 9    

 Fix the inverter B bracket as shown in Figure 19.

Find the positioning point and mark it.

2

 Use the impact drill (drill φ10.0mm, length 20cm) to directly drill the hole in the marking position, 

the depth of the hole is about 7cm.

3

 After the drilling is completed, insert the expansion tube into the drilled hole, and fix the bracket 

B with a 10mm self-tapping screw by using 10MM sleeve (SW10).

4

 Fix bracket B with the flange nut and use a 7MM sleeve on the two L-shaped brackets of the 

battery (SW7).

Step 8    

 Fix the bracket A of the inverter on the rear bracket of HV50056 with the flange nuts, as 

shown in Figure 18.
The bottom of the bracket A shall be placed at the same horizontal line with the rear bracket of 
HV50056.

INSTALLATION INSTRUCTIONS

INSTALLATION

NOTE:

 Place the PE bag on the battery to block out the dust before drilling.

15

16

Hanging Position for the Inverter

Hanging positions for the HV50056

Summary of Contents for HV50056

Page 1: ... ESS Australia Pty Ltd 61 402 500 520 Sales 61 1300 968 933 Technical Support australia alpha ess com www alpha ess com au Suite 1 Level 1 530 Botany Road Alexandria NSW 2015 Alpha ESS Italy S r l 39 599 239 50 info alpha ess it www alpha ess it Via Loda 17 41013 Castelfranco Emilia MO Alpha ESS Korea Co Ltd 82 64 721 2004 korea alpha ess com 2F 19 4 Nohyeong 11 gil Jeju si Jeju do Republic of Kor...

Page 2: ...WER METER 2 4 1 Meter ADL 3000 If Applicable 2 4 2 ACR10R Meter If Applicable 2 4 3 Meter setting 3 1 SWITCH ON 3 2 SWITCH OFF 4 1 FUNCTION DESCRIPTION 4 2 SETTING 4 3 EMS COMMUNICATION CHECKING 4 4 ASSEMBLING OF THE FRONT PANELS 5 1 SYSTEM SETUP IN MONITORING 5 1 1 BASIC INFORMATION 5 1 2 OTHER INFORMATION 6 1 ACCOUNT REGISTRATION 7 1 DATASHEET ALPHAESS STORION SMILE T10 V01 25062019 New This man...

Page 3: ...Wp Monitoring Device Alpha Cloud LAN Normal Loads Grid Grid Meter Critical Loads Storion SMILE T10 Grid Meter PV Inverter PV Inverter PV Monitoring Device Alpha Cloud LAN Normal Loads Grid Grid Meter Critical Loads Storion SMILE T10 Z1 of Grid Company Grid Meter Z2 of Grid Company PV PV Figure 3 Hybrid coupled Storage System Scheme Monitoring Device Alpha Cloud LAN Normal Loads Grid Grid Meter Cri...

Page 4: ... fault occurs it is possible that electrolyte may be leaked or toxic gases formed Do not install the system in any environment of temperature below 10 C or over 50 C and in which humidity is over 85 Do not touch the system with wet hands Do not put any heavy objects on top of the system Do not damage the system with sharp objects Do not install or operate the system in potentially explosive atmosp...

Page 5: ...able tie X6 HV50056 box X1 Terminal resistance X1 RJ45 Connectors X12 Screw package Expansion tube X5 Expansion screw X5 Battery power cables Positive power cable X1 Negative power cable X1 Communication cable X1 BAT HV Cable bond X1 Hexagon nuts with flange X4 User Manual X1 M4856 S HV50056 Quick Installation Manual X1 M4856 S HV50056 Object Description 1 2 3 4 5 6 Hybrid Inverter with Cable Box ...

Page 6: ...ult LED Display Green light blinks for 1 sec Red light blinks for 1 sec Red and green lights blink for 1 sec 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 No Description Description No External LCD Wiring Port SD Card Dip Switch Dry Contact LMU COM Port CAN BMU COM Port CAN COM Port Reserved LAN COM Port INV INV Earthing Point X 2 Required to connect with grounding copper AC Auxiliary Input B...

Page 7: ...cratch caused by rubbing inside packaging during shipping A claim should be made directly to shipping or insurance company in this case as soon as the container packaging is unloaded and such damage is identified Failure to follow any all of the user manual the installation guide and the mainte nance regulations Improper use or misuse of the device Insufficient ventilation of the device The mainte...

Page 8: ...es are required here sites that are higher than 3000 meters above the sea level sites with explosive atmosphere sites with direct sunlight sites with extreme change of ambient temperature wet rooms sites with highly flammable materials or gases or sites with a potentially explosive atmosphere Step 1 Take out the battery from the packaging box Step 2 Pull the buckle from the bottom right in the mid...

Page 9: ...row To install another battery repeat Steps 1 5 Step 6 Take the HV50056 out of the packaging box Pull out the top two guide rods and remove the front panel Remove the rear bracket from the HV50056 as shown in Figure 17 Step 4 Confirm the installation place at first Push the battery against the wall and confirm the location of the battery with a horizontal ruler Place the PE bag on the battery to b...

Page 10: ...brackets of the battery SW7 Step 9 Fix the inverter B bracket as shown in Figure 19 1 Find the positioning point and mark it 2 Use the impact drill drill φ10 0mm length 20cm to directly drill the hole in the marking position the depth of the hole is about 7cm 3 After the drilling is completed insert the expansion tube into the drilled hole and fix the bracket B with a 10mm self tapping screw by us...

Page 11: ... communication cable connection sequence the RJ45 connector of the communication cables shall go through the waterproof cap through the sealing ring through the joint and inserted in to the COM port inside of the battery HV50056 Battery communication cable connection sequence the RJ45 connec tor on one side shall go through the waterproof connector inserted into the COM port inside the battery whi...

Page 12: ... take the inverter s own net cable out First remove the cover then pass the net cable through the waterproof cap sealing ring and connector connect to the corresponding port and then the cover should be fixed back and the waterproof cap should be tightened as shown in Figure 27 INSTALLATION INSTALLATION NOTE 1 To remove the waterproof connector it shall be rotated counterclockwise according to the...

Page 13: ...e HV50056 and the inverter Step 9 DIP switch defines the ID address of each battery in one cluster Set the DIP switch of the nearest battery from the HV50056 to the farthest battery in sequence of 1 to N N is the number of the batteries which is min 4 and max 8 Figure 33 DIP Switch Definition AU DE Figure 34 Turning on the Switch On Grid L1 L2 L3 N PE Back Up L1 L2 L3 N On Grid L1 L2 L3 N PE Back ...

Page 14: ...se from ADL 3000 three phase meter with or without CT ACR10R three phase meter with CT Step 10 After wiring please open the front cover of HV50056 and turn on the molded case circuit breaker Figure 35 Installation of the front panels Figure 37 ADL 3000 Connection without CT without Meter Plug INSTALLATION INSTALLATION Note Meter 7 8 connect the RJ45 3 6 then RJ45 connect the Meter port on the cont...

Page 15: ...T without meter plug if applicable Figure 39 ADL 3000 Connection with CT without Meter Plug INSTALLATION INSTALLATION A PV meter will be applied in an AC hybrid system Note When connecting CTs pay attention to the current direction P1 should be nearest to the grid or the PV inverter A PV meter will be ap plied in an AC hybrid system 25 26 ...

Page 16: ...T Connection without Meter Plug INSTALLATION INSTALLATION Note When connecting CTs pay attention to the current direction P1 should be nearest to the grid or the PV inverter A PV meter will be applied in an AC hybrid system Note When connecting CTs pay attention to CT arrow directions please refer to Figure 41 A PV meter will be applied in an AC hybrid system 27 28 ...

Page 17: ...following interface press the up and down arrow keys to set the meter address the Grid meter DC AC and Hybrid system address is set to 001 and the PV meter AC and Hybrid system address is set to 002 Step 7 Click the Enter button and the address setting is completed Step 8 Click the SET button to enter the following interface Step 9 Click the SET button again to enter the save interface Step 10 Cli...

Page 18: ... front panel of the inverter and HV50056 Step 2 If backup load is applied turn off the Backup AC breaker Step 3 Turn off the MCCB of HV50056 and the ac switch on HV50056 Step 4 Turn off the PV switch DE PV switch on inverter AU external PV switch Step 5 Turn off the On grid AC breaker EMS INTRODUCTION AND SET UP 04 SYSTEM OPERATION 03 ON Fault OFF No Fault ON Battery communication is OK OFF Batter...

Page 19: ...y Function and check battery type M4856 S Step 6 Check SOC Calibration function set No Figure 49 CT Meter Option Interface Figure 50 Grid Setting InterfaceInterface Step 7 Choose CT Meter If you use CT please enter the relevant CT ratio If you don t use CT please enter the ratio as 1 Step 8 Click the Grid Function to set up relevant parameters about the grid Figure 51 Max Feed in rate Setting Inte...

Page 20: ...Figure 60 Date Time Setting Interface Figure 61 Ethernet interface Figure 62 Date Time Setting Interface Figure 63 Date Time Setting Interface Step 21 Make sure all the following number is correct Step 20 Click Language to set language Figure 64 BMS Figure 66 BMS Figure 67 Ethernet and Meter Figure 65 Ethernet and Meter Step 18 Click System in the setting menu Click Date Time and set up the date a...

Page 21: ...staller account and choose Storage System Maintenance Install new system to register new system at Alpha ESS Figure 68 Assembling of the Front Panels Step 1 Inverter part please unscwer the scwews of Bracket A and hang the front panel of the inverter onto Bracket B Fix the front panel to Bracket B with scwews Battery and control box Push the top two guide rods into the housing and press the buckle...

Page 22: ...st of storage systems and enter the SN Step 1 Open the portal www alphaess com Step 2 Please fill in Username Password and click Login if you have already registered If not please register by filling in the following web form Step 2 After selecting the correct system enter System Setup interface Enter in the Basic Information and enter below information Address Zip code Contact name E Mail address...

Page 23: ...3 4 EN61000 4 16 18 29 12 5 12 5A 12 5 22A 1000 V 600 V 15 2 15 2A 15 2 27 6A 2 200 850V 200 550V 180 V 25 A Three Phase 400 380 V 50 60 Hz Inverter Technical Specification Module Model BMU Model DC Voltage Range Nominal Output Current Battery Modules Connection Module Capacity Module Nominal Voltage Operating Temperature Range Module Weight Module Dimension W x D x H Cycle Life Max Charging Disch...

Reviews: