![Alltion AM-2000 User Manual Download Page 18](http://html1.mh-extra.com/html/alltion/am-2000/am-2000_user-manual_2904156018.webp)
Alltion (Guangxi) Instrument Co., Ltd.
14
Product Assembly
|
AM-2000 User’s Manual
Installation of Ceiling Mount
The ceiling to assemble the ceiling mount must be made of concrete or material with higher
hardness than concrete. Otherwise, it will be risk of falling down.
Drill 6 holes in the ground with Φ14 driller,
the hole depth is 75mm, and the position
dimension of the hole is as shown on the
right diagram;
When drilling, please note the direction of
power cord connection,The power connector
is along same direction with the pre-installed
socket on the ceiling.
Lock the ceiling mount assembly (2) to the
ceiling with six M10 expandable bolts (1);
Connect the power cable (3) to the power
connector, and then plug it into an
externally installed power socket.
Install the decorative cover(4) from the
bottom of the pole and bottom cover limit
block(5), tighten the bolts(6)of the locking
limit block after installation.
Finish the installation of the ceiling mount.
1
2
4
5
3
Network
power
supply
6
Power Connector
Summary of Contents for AM-2000
Page 9: ...Alltion Guangxi Instrument Co Ltd AM 2000 User s Manual Safety Caution 5 1 4 3 2 3 5...
Page 11: ...Alltion Guangxi Instrument Co Ltd AM 2000 User s Manual Product Assembly 7 2 1 3 4 5 7 8 6...
Page 14: ...Alltion Guangxi Instrument Co Ltd 10 Product Assembly AM 2000 User s Manual 17 19 20 18...
Page 34: ...Alltion Guangxi Instrument Co Ltd 30 Product Functions AM 2000 User s Manual 1 2 3 4 5 6 7 7 7...
Page 36: ...Alltion Guangxi Instrument Co Ltd 32 Product Functions AM 2000 User s Manual 5 7 3 1 2 4 6 7...