KEENAN
MechFiber400 Operator’s Manual
Revision G02 28
th
Sept 2020
75
17:
Blockage at rear feed-out conveyor
Use VFC-door to meter material intake into auger.
Refer to Section 7.9 on feeding out for information
about the correct operation of the VFC-door.
Ensure the conveyor belt rotates as VFC is opened.
Check setting of priority flow valve (if fitted).
In the unlikely event of a large blockage preventing
the machine from restarting using the tractor, it may
be necessary to enter the mixing chamber or gain
access to the discharge auger chamber to manually
clear the blockage. Please refer to Section 5, Point
U, on safety.
12.2 Weighing troubleshooting