
PG. 9
the module should easily snap onto the magnetic screws. For each cabinet there
should be 6 modules.
Step 12
For a clean finish now attach the protective edging. You may need to temporarily pop
off some of the modules to secure the edging using the rivets provided. After the
edging is attached you can reattach the modules. Make sure you thread the power
cables/data cable through the protective edge as you attach the bottom sections of
edging.
Step 13
The final steps are to connect the loose cables. Connect each of the power cables in
the vertical columns to the power sources. Take the data cable and connect it to the
pre-configured sending box which should connect to the pre-configured media player.