Pre-Setup 

 

 

 

 

 

 

Parts List 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Please read entire instruction sheet before you start. 

Please consult with a trained electrician at least one day before installation to discuss the 
power sources for the DV-LED video wall. 

Please consult with your project manager for arrangements on where to house the external 
sending card box and media player. 
 

Tools:

 1 x Screwdriver, 1 x Drill, 1 x Spirit Level, 1 x Magnetic Module Tool 

 

 

 

 

As each DV-LED display is unique, these figures are based per cabinet/module 

For each cabinet enclosure there should be; 

 

1 x Power Supply Cable 

 

1 x Network Cable 

 

6 x LED Modules 

 

5 x M8 Screws (pictured) 

  

 

For each module there should be; 

 

8 x Magnetic Screws (pictured) 
(8 Screws x 6 Modules = 48 screws per cabinet) 

 

Based on your DV-LED configuration you should be able to calculate how many protective 
edging pieces you need. There are two different sizes depending on whether the edging is 
going on the top/bottom of the cabinet or the side. 

 

 

Summary of Contents for DV-LED

Page 1: ...PG 1 DV LED Installation Guide...

Page 2: ...x Spirit Level 1 x Magnetic Module Tool As each DV LED display is unique these figures are based per cabinet module For each cabinet enclosure there should be 1 x Power Supply Cable 1 x Network Cable...

Page 3: ...ally using two of the M8 screws for each cabinet as per the diagram below Depending on the configuration of your DV LED Video Wall you will be supplied with mounting brackets either 1 2m in length or...

Page 4: ...mounting brackets available and you may need to use a combination of both The shorter 1 2m bracket can mount two cabinets wide and the longer 1 8m bracket can mount 3 cabinets wide Step 5 Lift each ca...

Page 5: ...ideo Wall should now look something like this Step 6 Attach each of the columns to its horizontal neighbour Take this by take a cabinet and secure it to the neighbor using 3 of the M8 screws provided...

Page 6: ...lies from one cabinet to the next until you are left with the power supply cable sticking out of each of the bottom cabinets We recommend leaving about 3m 5m of power cable coming out of the bottom ca...

Page 7: ...king from the top right corner connect all the cabinets using the RJ45 ports you can use either port for in and out You should connect them like a snake working vertically up and down and across each...

Page 8: ...ew the stopper circled in red Step 10 Take the modules out of the box and connect the magnetic screws For each module attach 8 screws 4 along the top and 4 along the bottom Step 11 Attach the magnetic...

Page 9: ...vets provided After the edging is attached you can reattach the modules Make sure you thread the power cables data cable through the protective edge as you attach the bottom sections of edging Step 13...

Reviews: