
PG. 3
Instructions
Step 1
Clear a space on the floor and lay the cabinets in the formation they will be going on
the wall. The cabinets should be facing up with the interior of the cabinet exposed.
Step 2
Within your layout, organise the cabinets into vertical columns and screw the cabinets
together vertically using two of the M8 screws for each cabinet as per the diagram
below.
Depending on the configuration of your DV-LED Video Wall you will be supplied with mounting
brackets either 1.2m in length or 1.8m in length. We do NOT supply screws for the mounting
bracket due to the various types of walls which the mounting brackets can be used upon.
For each 1.2m section of bracket we recommend of using 5-6 M8 screws as minimum.
For each 1.8m section of bracket we recommend of using 6-8 M8 screws as minimum.