47
6/9/2011
MAINTENANCE
HYDRAULIC PUMP
Hydraulic Oil Specifications
Adding Hydraulic Oil
Fill the reservoir with automatic transmission fluid
or any clean hydraulic fluid having a viscosity in-
dex that is suitable for the climate conditions in
which the unit will be operated. Standard units
are supplied with automatic transmission fluid
(ATF), and arctic units are supplied with aviation
hydraulic fluid (
see Figure 31
).
Figure 31
Figure 32
The Safety messages that follow have
WARNING level Electrocution Hazards.
Only qualified electricians should ser-
vice or perform replacement proce-
dures. Ballast and capacitors are capa-
ble of discharging high voltage. Always
use appropriate personal safety cloth-
ing and gear when servicing electrical
components.
High voltage is present when engine is
running. Never attempt to service elec-
trical components while engine is run-
ning.
Do not operate the light tower if the in-
sulation on the electrical wiring is cut
or worn, or if bare wires are exposed.
Repair or replace damaged wiring be-
fore starting the engine.
1. Lamp Ballast
2. Capacitors
Summary of Contents for Night Lite Pro SE Power V Series
Page 2: ......
Page 8: ...8 6 9 2011 SAFETY...
Page 9: ...9 6 9 2011 SAFETY...
Page 10: ...10 6 9 2011 SAFETY...
Page 11: ...11 6 9 2011 SAFETY...
Page 12: ...12 6 9 2011 SAFETY...
Page 14: ...14 6 9 2011 SAFETY PART NO 090160 PART NO 090005 PART NO 090159 PART NO 090159...
Page 16: ...16 6 9 2011 NOTES...
Page 24: ...24 6 9 2011 TRAILERING TRANSPORTING AND LIFTING...
Page 25: ...25 6 9 2011 TRAILERING TRANSPORTING AND LIFTING...
Page 26: ...26 6 9 2011 TRAILERING TRANSPORTING AND LIFTING...
Page 27: ...27 6 9 2011 GENERAL SERVICE INFORMATION EQUIPMENT IDENTIFICATION...
Page 34: ...34 6 9 2011 GENERAL SERVICE INFORMATION...
Page 36: ...36 6 9 2011 OPERATION...
Page 37: ...37 6 9 2011 OPERATION...
Page 38: ...38 6 9 2011 OPERATION...
Page 42: ...42 6 9 2011 OPERATION...
Page 45: ...45 6 9 2011 OPERATION...
Page 48: ...48 6 9 2011 MAINTENANCE...
Page 49: ...49 6 9 2011 MAINTENANCE...
Page 50: ...50 6 9 2011 MAINTENANCE...
Page 51: ...51 6 9 2011 MAINTENANCE...
Page 52: ...52 6 9 2011 MAINTENANCE...
Page 53: ...53 6 9 2011 TROUBLESHOOTING...
Page 54: ...54 6 9 2011 MAINTENANCE RECORD DATE SERVICE DESCRIPTION SERVICED BY...
Page 55: ...55 6 9 2011 KOHLER ENGINE WIRING SCHEMATIC...
Page 56: ...56 6 9 2011 KOHLER CONTROL PANEL WIRING SCHEMATIC...
Page 57: ...57 6 9 2011 CAT C1 1 ENGINE WIRING SCHEMATIC...
Page 58: ...58 6 9 2011 KUBOTA D1105 WIRING SCHEMATIC...
Page 59: ...59 6 9 2011 MECC ALTE GENERATOR WIRING SCHEMATIC...
Page 60: ...60 6 9 2011 MECC ALTE GENERATOR WIRING SCHEMATIC...
Page 61: ...61 6 9 2011 MECC ALTE GENERATOR WIRING SCHEMATIC PRE 2011...
Page 62: ...62 6 9 2011 MARATHON GENERATOR WIRING SCHEMATIC...
Page 63: ...63 6 9 2011 HYDRAULIC SYSTEM WIRING SCHEMATIC...
Page 64: ...64 6 9 2011 E STOP W O GLOW LAMPS...
Page 65: ...65 6 13 2011 TAILLIGHT WIRING SCHEMATIC...
Page 66: ...66 6 9 2011 WARRANTY...
Page 67: ...67 6 9 2011 WARRANTY...