![Allmand Night Lite Pro SE Power V Series Owner'S Manual Download Page 43](http://html1.mh-extra.com/html/allmand/night-lite-pro-se-power-v-series/night-lite-pro-se-power-v-series_owners-manual_2903343043.webp)
43
6/9/2011
OPERATION
Raising and Lowering the Light
Tower
Light Tower
Note: The Hydraulic actuated light tower
uses 12VDC battery power to operate. The
light tower may be raised and lowered as
needed without the engine running.
Figure 18
1. Seven Section Light Tower
Raising
NOTICE:
Before raising light tower, visu-
ally inspect equipment for damage or wear
and repair or replace components as re-
quired. Never operate the light tower with
damaged or malfunctioning components.
1
1. Before raising the light tower, adjust the tower
lights to the desired work position; see
Light
Bar and Light Fixture Adjustment
on page 42.
2.
If required, start engine. Refer to your
Engine
Operator’s Manual
for starting procedure.
3.
Turn the lights off; see
Light Control Panel
on
page 44.
4.
Press the light tower hydraulic lift switch up to
raise the light tower to the desired height.
Figure 19
1. Light Tower Hydraulic Lift Switch.
Lowering
1. If required, start engine. Refer to your
Engine
Operator’s Manual
for starting procedure.
2. Turn the lights off; see
Light Control Panel
on
page 44.
3. Press the tower light hydraulic lift Switch down
to lower the light tower to the desired height or
to the full DOWN position.
4. When tower reaches the bottom, run switch
for 3 additional seconds to ensure that the
tower is at its lowest possible position.
5. Stop engine.
1
Summary of Contents for Night Lite Pro SE Power V Series
Page 2: ......
Page 8: ...8 6 9 2011 SAFETY...
Page 9: ...9 6 9 2011 SAFETY...
Page 10: ...10 6 9 2011 SAFETY...
Page 11: ...11 6 9 2011 SAFETY...
Page 12: ...12 6 9 2011 SAFETY...
Page 14: ...14 6 9 2011 SAFETY PART NO 090160 PART NO 090005 PART NO 090159 PART NO 090159...
Page 16: ...16 6 9 2011 NOTES...
Page 24: ...24 6 9 2011 TRAILERING TRANSPORTING AND LIFTING...
Page 25: ...25 6 9 2011 TRAILERING TRANSPORTING AND LIFTING...
Page 26: ...26 6 9 2011 TRAILERING TRANSPORTING AND LIFTING...
Page 27: ...27 6 9 2011 GENERAL SERVICE INFORMATION EQUIPMENT IDENTIFICATION...
Page 34: ...34 6 9 2011 GENERAL SERVICE INFORMATION...
Page 36: ...36 6 9 2011 OPERATION...
Page 37: ...37 6 9 2011 OPERATION...
Page 38: ...38 6 9 2011 OPERATION...
Page 42: ...42 6 9 2011 OPERATION...
Page 45: ...45 6 9 2011 OPERATION...
Page 48: ...48 6 9 2011 MAINTENANCE...
Page 49: ...49 6 9 2011 MAINTENANCE...
Page 50: ...50 6 9 2011 MAINTENANCE...
Page 51: ...51 6 9 2011 MAINTENANCE...
Page 52: ...52 6 9 2011 MAINTENANCE...
Page 53: ...53 6 9 2011 TROUBLESHOOTING...
Page 54: ...54 6 9 2011 MAINTENANCE RECORD DATE SERVICE DESCRIPTION SERVICED BY...
Page 55: ...55 6 9 2011 KOHLER ENGINE WIRING SCHEMATIC...
Page 56: ...56 6 9 2011 KOHLER CONTROL PANEL WIRING SCHEMATIC...
Page 57: ...57 6 9 2011 CAT C1 1 ENGINE WIRING SCHEMATIC...
Page 58: ...58 6 9 2011 KUBOTA D1105 WIRING SCHEMATIC...
Page 59: ...59 6 9 2011 MECC ALTE GENERATOR WIRING SCHEMATIC...
Page 60: ...60 6 9 2011 MECC ALTE GENERATOR WIRING SCHEMATIC...
Page 61: ...61 6 9 2011 MECC ALTE GENERATOR WIRING SCHEMATIC PRE 2011...
Page 62: ...62 6 9 2011 MARATHON GENERATOR WIRING SCHEMATIC...
Page 63: ...63 6 9 2011 HYDRAULIC SYSTEM WIRING SCHEMATIC...
Page 64: ...64 6 9 2011 E STOP W O GLOW LAMPS...
Page 65: ...65 6 13 2011 TAILLIGHT WIRING SCHEMATIC...
Page 66: ...66 6 9 2011 WARRANTY...
Page 67: ...67 6 9 2011 WARRANTY...