4
TOWER LIGHTS
25
GENERATOR
25
CAT C1.1
26
OPTIONAL ACCESSORY EQUIPMENT
27
OPERATION
28-38
PRE-OPERATION SETUP
28
WORK SITE CONSIDERATIONS
28
PRE-OPERATION CHECK LIST
28
LEVELING AND STABILIZING THE TRAILER
29
INSTALLING THE GROUND ROD
30
ENGINE OPERATION
31
PRE-START CHECKS
31
ENGINE CONTROL PANELS
31
STARTING THE ENGINE
31
STOPPING THE ENGINE
31
EMERGENCY STOP SWITCH
32
BATTERY DISCONNECT SWITCH
32
AUTOMATIC ENGINE SHUTDOWN SYSTEM
32
TOWER AND LIGHT OPERATION-VERTICAL
32
TOWER AND LIGHT OPERATION-LAYDOWN
32
LIGHTBAR AND LIGHT FIXTURE ADJUSTMENT-VERTICAL
33
LIGHTBAR AND LIGHT FIXTURE ADJUSTMENT-LAYDOWN
34
RAISING AND LOWERING THE LIGHT TOWER-VERTICAL
34-35
RAISING AND LOWERING THE LIGHT TOWER-MANUAL LAYDOWN
35-36
RAISING AND LOWERING THE LIGHT TOWER-ELECRIC LAYDOWN
36-37
ELECTRIC WINCH AUXILLARY HANDLE
37
LIGHT CONTROL PANEL
38
SHUTDOWN PROCEDURE
38
SHUTDOWN
38
MAINTENANCE
39-44
TABLE OF CONTENTS
Not
for
Reproduction
Summary of Contents for MAXI-LITE AS3000
Page 46: ...46 MAINTENANCE RECORD DATE SERVICE DESCRIPTION SERVICED BY N o t f o r R e p r o d u c t i o n...
Page 47: ...47 SCHEMATICS N o t f o r R e p r o d u c t i o n...
Page 48: ...48 SCHEMATICS N o t f o r R e p r o d u c t i o n...
Page 49: ...49 SCHEMATICS N o t f o r R e p r o d u c t i o n...
Page 50: ...50 SCHEMATICS N o t f o r R e p r o d u c t i o n...
Page 51: ...51 SCHEMATICS N o t f o r R e p r o d u c t i o n...
Page 52: ...52 WARRANTY N o t f o r R e p r o d u c t i o n...
Page 53: ...53 WARRANTY N o t f o r R e p r o d u c t i o n...