2
Table of Contents
Safety Precaution Sheet
3
MultiPrep™ System Technical Data
4
Warranty/Service 5-6
Installation 7-8
Electrical
7
Plumbing
8
MultiPrep™ Base Operation
9-12
Faceplate
Diagram
9
Electronics
Calibration
9
Platens, Splash Ring
10
Button
Functions
10-11
Theory of Operation, MultiPrep™ System
11
MultiPrep™ Head Installation
12
MultiPrep™ Head Operation
13-18
Vertical Movement & Positioning
13
Fixture
Attachment
14
Rotation
15
Oscillation
16
Angular
Adjustments
17
Sample
Load
18
MultiPrep™ System Alignment
18-23
Theory
18
Step 1: Verification of Platen Run-Out
19-20
Step 2: Perpendicular Alignment of Spindle to Platen
21-22
Step 3: Alignment of Micro-Hub Assembly to Platen
22-23
Explanation of Digital Indicators
24-25
Specific Material Removal
25-26
Fixture Descriptions
27-29
Options/Accessories 30
Maintenance 31-32
Troubleshooting 33-34
Wiring Diagrams
35-38
CE Certificates (230 V AC MultiPrep™ Systems Only)
39-41
Summary of Contents for MultiPrep System 15-2000-GI
Page 35: ...35 MultiPrep System Wiring Diagrams ...
Page 36: ...36 ...
Page 37: ...37 ...
Page 38: ...38 ...
Page 39: ...39 CE Certificates ...
Page 40: ...40 ...
Page 41: ...41 ...
Page 42: ...42 This page has been left blank intentionally ...
Page 43: ...43 This page has been left blank intentionally ...