Joint Cementing Procedure
All cementing of joints should be done according to the
specifications outlined in ASTM D 2855.
1. Measure and cut vent pipe to desired length.
2. Debur and chamfer end of pipe, removing any ridges
or rough edges. If end is not chamfered, edge of pipe
may remove cement from fitting socket and result in a
leaking joint.
3. Clean and dry surfaces to be joined.
4. Test fit joint and mark depth of fitting on outside of pipe.
5. Uniformly apply a liberal coat of PVC primer for PVC
or use a clean dry cloth for ABS to clean inside socket
surface of fitting and male end of pipe to depth of fitting
socket.
6. Promptly apply solvent cement to end of pipe and inside
socket surface of fitting. Cement should be applied
lightly but uniformly to inside of socket. Take care to
keep excess cement out of socket. Apply second coat
to end of pipe.
NOTE:
Time is critical at this stage. Do Not allow Primer
to dry before applying cement.
7. Immediately after applying last coat of cement to pipe,
and while both inside socket surface and end of pipe
are wet with cement, forcefully insert end of pipe into
socket until it bottoms out. Turn PVC pipe 1/4 turn
during assembly (but not after pipe is fully inserted) to
distribute cement evenly. Do not turn ABS or cellular
core pipe.
NOTE:
Assembly should be completed within 20 seconds
after last application of cement. Hammer blows should not
be used when inserting pipe.
8. After assembly, wipe excess cement from pipe at end
of fitting socket. A properly made joint will show a bead
around its entire perimeter. Any gaps may indicate an
improper defective assembly due to insufficient solvent.
9. Handle joints carefully until completely set.
NOTE:
A sheet metal screw may be used to secure the
intake
pipe to the connector, if desired. Use a drill or self
tapping screw to make a pilot hole.
Venting Practices
Piping Suspension Guidelines
Figure 19
* See Table 4 for allowable pipe.
NOTE:
Isolate piping at the point where it exits the outside wall or
roof in order to prevent transmission of vibration to the structure.
SCHEDULE 40
PVC − 5’
all other pipe* − 3’
Wall
e
d
i
s
t
u
o
e
d
i
s
n
i
24" maximum
3/4" minimum
Wall Thickness Guidelines
insulation
(if required)
Figure 20
CHIMNEY
OR GAS
VENT
(Check sizing
for remaining
appliance)
FURNACE
(Removed from
from common
vent system)
WATER
HEATER
OPENINGS
(To Adjacent
Room)
REPLACING FURNACE THAT
WAS PART OF A COMMON
VENT SYSTEM
If this gas furnace replaces a furnace which was
commonly vented with another gas appliance,
the size of the existing vent pipe for that gas appliance
must be checked. Without the heat of the original
furnace flue products, the existing vent pipe is
probably oversized for the single water heater or
other appliance. The vent should be checked for
proper draw with the remaining appliance.
DANGER OF EXPLOSION!
Fumes from PVC glue may ignite during system check.
Allow fumes to dissipate for at least 5 minutes before
placing unit into operation.
DANGER
Summary of Contents for 95G1DFE
Page 29: ...507277 02 Page 29 of 52 Issue 1621 Figure 43 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC ...
Page 35: ...507277 02 Page 35 of 52 Issue 1621 Typical Wiring Diagram Figure 50 For A95DF1E 95G1DFE ...
Page 46: ...507277 02 Page 46 of 52 Issue 1621 Troubleshooting Heating Sequence of Operation ...
Page 47: ...507277 02 Page 47 of 52 Issue 1621 Troubleshooting Heating Sequence of Operation continued ...
Page 48: ...507277 02 Page 48 of 52 Issue 1621 Troubleshooting Cooling Sequence of Operation ...
Page 49: ...507277 02 Page 49 of 52 Issue 1621 Troubleshooting Continuous Fan Sequence of Operation ...