Chapter 2: Installation
54
Unpacking the switch: AT-x230-28GT
To unpack the switch, perform the following procedure:
1. Remove all of the components from the shipped package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Verify that the shipped package includes the following items:
2 x Brackets
6 x Screws
1 Power cable (1.8m)
1 Console cable (2m)
AT-x230-28GT
1 Power cable hook