AT-x230-10GT, AT-x230-10GP, AT-x230-18GT, AT-x230-18GP, AT-x230-28GT and AT-x230-28GP Switch Installation Guide
45
Chapter 2
Installation
This chapter contains the following sections:
“Reviewing safety precautions” on page 46
“Selecting a site for the switch” on page 48
“Cable specifications” on page 49
“Unpacking the switch: AT-x230-10GT” on page 50
“Unpacking the switch: AT-x230-10GP” on page 51
“Unpacking the switch: AT-x230-18GP and AT-x230-18GT” on
page 52
“Unpacking the switch: AT-x230-28GP” on page 53
“Unpacking the switch: AT-x230-28GT” on page 54
“Installing the switch on a table or a desktop” on page 55
“Removing the feet from a switch before installing it in an
equipment rack or on a wall” on page 56
“Installing an AT-x230-10GT switch in an equipment rack” on
page 57
“Installing an AT-x230-10GP switch in an equipment rack” on
page 60
“Installing an AT-x230-18GP, AT-x230-18GT, or AT-x230-28GT
switch in an equipment rack” on page 62
“Installing an AT-x230-28GP switch in an equipment rack” on
page 64
“Installing an AT-x230-10GT switch on a wall” on page 66
“Installing an x230-18GT, x230-28GT or x230-GP Series switch on
a wall” on page 68
“Cabling the switch” on page 70
“Powering on the switch” on page 72
“Starting a local management session” on page 74
“Monitoring the initialization processes” on page 76