![Allied Air A80DS2V Installation Instructions Manual Download Page 44](http://html1.mh-extra.com/html/allied-air/a80ds2v/a80ds2v_installation-instructions-manual_2901842044.webp)
506892-01
Page 44 of 64
Issue 1251
Application Using a Single Stage Thermostat
B - Heating Sequence - Integrated Control Thermostat
Selection DIP switch 1 ON in “Single-Stage” Position
NOTE:
In these applications, two-stage heat will be initiated
by the integrated control if heating demand has not been
satisfied after the field adjustable period (7 or 12 minutes).
1.
On a call for heat, thermostat first stage contacts close
sending a signal to the integrated control. The integrated
control runs a self diagnostic program and checks high
temperature limit switches for normally closed contacts
and pressure switches for normally open contacts. The
combustion air inducer is energized at low speed.
2.
Once the control receives a signal that the low pressure
switch has closed, the combustion air inducer begins a
15 second prepurge in low speed.
NOTE
:
If the low fire pressure switch does not close the
combustion air inducer will switch to high fire. After a
15 second pre-purge the high fire pressure switch will
close and the unit will begin operation on high fire. After
10 to 20 seconds of high fire operation the unit will switch
to low fire.
3.
After the prepurge is complete, a 20 second initial ignitor
warm-up period begins. The combustion air inducer
continues to opeate at the ignition speed.
4.
After the 20-second warm-up period has ended, the
gas valve is energized on low fire (first stage) and
ignition occurs. At the same time, the control module
sends a signal to begin an indoor blower 30-second
ON-delay. When the delay ends, the indoor blower
motor is energized on the low fire heating speed and
the HUM contacts are energized. The integrated control
also initiates a second-stage on delay (factory-set at 7
minutes; adjustable to 12 minutes).
5.
If the heating demand continues beyond the second-
stage on delay, the integrated control energizes the
combustion air inducer at high speed. The control also
checks the high fire (second stage) pressure switch to
make sure it is closed. the high fire (second-stage) gas
valve is energized and the indoor blower motor is
energized for operation at the high fire heating speed.
6.
When the thermostat heating demand is satisfied, the
combustion air inducer begins a 5-second low speed
post-purge. The field-selected indoor blower off delay
begins. The indoor blower operates at the low-fire
heating speed.
7.
When the combustion air post-purge period is complete,
the inducer, the HUM contacts as well as the 120V ACC
terminals are de-energized. The indoor blower is de-
energized at the end of the off delay.
Figure 30
Figure 29
Summary of Contents for A80DS2V
Page 3: ...506892 01 Page 3 of 64 Issue 1251 EXPANDED VIEW Figure 1...
Page 24: ...506892 01 Page 24 of 64 Issue 1251 Figure 22...
Page 30: ...506892 01 Page 30 of 64 Issue 1251 Figure 24 A80DS2V Schematic Wiring Diagram...
Page 31: ...506892 01 Page 31 of 64 Issue 1251 Typical A80DS2V Field Wiring Diagram Figure 25...
Page 32: ...506892 01 Page 32 of 64 Issue 1251 Integrated Control Figure 26...
Page 50: ...506892 01 Page 50 of 64 Issue 1251 Integrated Control Diagnostic Codes...
Page 51: ...506892 01 Page 51 of 64 Issue 1251 Integrated Control Diagnostic Codes continued...
Page 52: ...506892 01 Page 52 of 64 Issue 1251 Integrated Control Diagnostic Codes continued...
Page 53: ...506892 01 Page 53 of 64 Issue 1251 Integrated Control Diagnostic Codes continued...
Page 54: ...506892 01 Page 54 of 64 Issue 1251 Integrated Control Diagnostic Codes continued...
Page 55: ...506892 01 Page 55 of 64 Issue 1251 Program Unit Capacity Size Mode...
Page 56: ...506892 01 Page 56 of 64 Issue 1251 Troubleshooting Heating Sequence of Operation...
Page 57: ...506892 01 Page 57 of 64 Issue 1251 Troubleshooting Heat Sequence of Operation continued...
Page 58: ...506892 01 Page 58 of 64 Issue 1251 Troubleshooting Heat Sequence of Operation continued...
Page 59: ...506892 01 Page 59 of 64 Issue 1251 Troubleshooting Heat Sequence of Operation continued...
Page 60: ...506892 01 Page 60 of 64 Issue 1251 Troubleshooting Continuous Fan Sequence of Operation...
Page 61: ...506892 01 Page 61 of 64 Issue 1251 Start Up Performance Check List UNIT SET UP...
Page 62: ...506892 01 Page 62 of 64 Issue 1251 Start Up Performance Check List continued...