506526-01
Page 5 of 39
Issue 1031
Temperature Rise
NOTE:
Furnace must be adjusted to obtain
a
temperature
rise within the range specified on the unit nameplate. Failure
to do
so
may cause erratic limit operation and may result in
premature heat exchanger failure.
This furnace must be installed so that its electrical
components are protected from water.
Installed in Combination with a Cooling Coil
When this furnace is used with cooling units, it shall be
installed in parallel with, or on the upstream side of, cooling
units to avoid condensation in the heating compartment. See
Figure 2. With a parallel flow arrangement, a damper (or
other means to control the flow of air) must adequately
pre-vent chilled air from entering the furnace. If the damper
is manually operated, it must be equipped to prevent
operation of either the heating or the cooling unit, unless it
is in the full
HEAT or COOL
setting. See Figure 2.
Figure 2
Heating Unit Installed Parallel to Air Handler Unit
Heating Unit Installed Upstream of Cooling Unit
This furnace may be installed in alcoves, closets, attics,
basements, garages, and utility rooms in the upflow or
horizontal position.
This furnace design has not been CSA certified for
installation in mobile homes, recreational vehicles, or
outdoors.
Use of Furnace as a Construction Heater
Allied Air does not recommended the use of these units as
a construction heater during any phase of construction. Very
low return air temperature, harmful vapors and operation of
the unit with clogged or misplaced filters will damage the
unit.
Units may be used for heating of buildings or structures
under construction, if the following conditions are met:
•
The vent system must be permanently installed per these
installation instructions.
•
A room thermostat must control the furnace. The use of
fixed jumpers that will provide continuous heating is not
allowed.
•
The return air duct must be provided and sealed to the
furnace.
•
Return air temperature range between 60°F (16°C) and
80°F (27°C) must be maintained.
•
Air filters must be installed in the system and must be
maintained during construction.
•
Air filters must be replaced upon construction
completion.
•
The input rate and temperature rise must be set per the
furnace rating plate.
•
One hundred percent (100%) outdoor air must be
provided for combustion air requirements during
construc-tion. Temporary ducting may supply outdoor
air to the furnace. Do not connect duct directly to the
furnace. Size the temporary duct following these
instructions in section for Combustion, Dilution and
Ventilation Air in a confined space with air from outside.
•
The furnace heat exchanger, components, duct system,
air filters and evaporator coils must be thoroughly
cleaned following final construction clean-up.
•
All furnace operating conditions (including ignition, input
rate, temperature rise and venting) must be verified
according to these installation instructions.
When installed, this furnace must be electrically grounded
according to local codes. In addition, in the United States,
installation must conform with the current National Electric
Code, ANSI/NFPA No. 70. The National Electric Code (ANSI/
NFPA No. 70) is available from the following address:
National Fire Protection Association
1 Battery March Park
Quincy, MA 02269
NOTE:
This furnace is designed for
a
minimum continuous
return air temperature
of
60° F (16°C) or an intermittent
operation down to 55° F (13°C) dry bulb for cases where
a
night setback thermostat is used. Return air temperature
must not exceed 85° F (29°C) dry bulb.
Summary of Contents for 80G1UH
Page 3: ...506526 01 Page 3 of 39 Issue 1031 A80UH 80G1UH Expanded View Figure 1...
Page 27: ...506526 01 Page 27 of 39 Issue 1031 Wiring Diagram Figure 32...
Page 38: ...506526 01 Page 38 of 39 Issue 1031 START UP PERFORMANCE CHECK LIST UNIT SET UP...
Page 39: ...506526 01 Page 39 of 39 Issue 1031 UNIT OPERATION...