506526-01
Page 4 of 39
Issue 1031
A80UH & 80G1UH Gas Furnace
The A80UH & 80G1UH gas furnace is shipped ready for
installation in the upflow or horizontal right position (for
horizontal left position the combustion air pressure switch
must be moved). The furnace is shipped with the bottom
panel in place. The bottom panel must be removed if the
unit is to be installed in horizontal or upflow applications with
bottom return air.
The furnace is equipped for installation in natural gas
applications. A conversion kit (ordered separately) is required
for use in propane/LP gas applications.
Shipping and Packing List
1 - Assembled Gas Furnace
1 - Bag assembly containing the following:
2 - Screws
3 - Wire nuts
1 - Snap bushing
1 - Snap Plug
1 - Wire tie
1 - Vent warning label
1 - Owner’s manual and warranty card
Check equipment for shipping damage. If you find any
damage, immediately contact the last carrier.
Safety Information
As with any mechanical equipment, personal injury can
result from contact with sharp sheet metal edges. Be
careful when you handle this equipment.
CAUTION
DANGER OF EXPLOSION!
DANGER
There are circumstances in which odorant used with
LP/Propane gas can lose its scent. In case of a leak,
LP/Propane gas will settle close to the floor and may be
difficult to smell. An LP/Propane leak detector should
be installed in all LP applications.
Improper installation, adjustment, alteration, service or
maintenance can cause property damage, personal
injury or loss of life. Installation and service must be
performed by a licensed professional installer (or
equivalent), service agency or the gas supplier.
WARNING
Certifications
These units are CSA International certified to ANSI Z21.47.
In the USA, installation of gas furnaces must conform with
local building codes. In the absence of local codes, units
must be installed according to the current National Fuel Gas
Code (ANSI-Z223.1). The National Fuel Gas Code is
available from the following address:
American National
Standards Institute, Inc., 11 West 42nd Street, New York,
NY 10036.
Clearances
Adequate clearance must be made around the air openings
into the vestibule area. In order to ensure proper unit
operation, combustion and ventilation air supply must be
provided according to the current National Fuel Gas Code.
Vent installations must be consistent with the venting tables
(in this instruction) and applicable provisions of local building
codes.
This furnace is CSA International certified for installation
clearances to combustible material as listed on the unit
nameplate and in the tables in Figures 8 and 12. Accessibility
and service clearances must take precedence over fire
protection clearances.
NOTE:
For installation on combustible floors, the furnace
shall not be installed directly on carpeting, tile, or other
combustible material other than wood flooring.
Installed Locations
For installation in a residential garage, the furnace must be
installed so that the burner(s) and the ignition source are
located no less than 18 inches (457 mm) above the floor.
The furnace must be located or protected to avoid physical
damage by vehicles. When a furnace is installed in a public
garage, hangar, or other building that has a hazardous
atmosphere, the furnace must be installed according to
recommended good practice requirements and current
National Fuel Gas Code.
Please refer to specification sheets for available accessories.
Summary of Contents for 80G1UH
Page 3: ...506526 01 Page 3 of 39 Issue 1031 A80UH 80G1UH Expanded View Figure 1...
Page 27: ...506526 01 Page 27 of 39 Issue 1031 Wiring Diagram Figure 32...
Page 38: ...506526 01 Page 38 of 39 Issue 1031 START UP PERFORMANCE CHECK LIST UNIT SET UP...
Page 39: ...506526 01 Page 39 of 39 Issue 1031 UNIT OPERATION...