Horizontal Position
HORIZONTAL LEFT POSITION
Top Vent discharge
Figure 19
•
Disconnect pressure switch hose from barbed fitting on the pressure
switch assembly. Remove pressure switch assembly (1 screw) and cut
wire tie to free pressure switch wires. Reinstall pressure switch on the
other side of orifice plate and reconnect pressure switch hose.
•
Resecure pressure seitch wires: Either pull excess wires through the
blower compartment and secure using supplied wire tie, or coil excess
wire and secure to the gas manifold.
HORIZONTAL RIGHT POSITION
Top Vent Discharge
Figure 21
•
Remove make-up box assembly (2 screws) and cut wire tie to free make-
up box wires. Reinstall make-up box on other side of cabinet.
•
Resecure make-up box wires: Either pull excess wires through the blower
compartment and secure using supplied wire tie, or coil excess wire and
secure to the gas manifold.
HORIZONTAL LEFT POSITION
Side Vent Discharge
Figure 20
•
Disconnect pressure switch hose from barbed fitting on the pressure
switch assembly. Remove pressure switch assembly (1 screw) and cut
wire tie to free pressure switch wires. Reinstall pressure switch on the
other side of orifice plate and reconnect pressure switch hose.
•
Resecure pressure seitch wires: Either pull excess wires through the
blower compartment and secure using supplied wire tie, or coil excess
wire and secure to the gas manifold.
HORIZONTAL RIGHT POSITION
Side Vent Discharge
Figure 22
Summary of Contents for 80G1UH
Page 3: ...506526 01 Page 3 of 39 Issue 1031 A80UH 80G1UH Expanded View Figure 1...
Page 27: ...506526 01 Page 27 of 39 Issue 1031 Wiring Diagram Figure 32...
Page 38: ...506526 01 Page 38 of 39 Issue 1031 START UP PERFORMANCE CHECK LIST UNIT SET UP...
Page 39: ...506526 01 Page 39 of 39 Issue 1031 UNIT OPERATION...