38
60549
Section 5 Service Procedures
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the dryer(s) before servicing.
• Close gas shut-off valve to gas dryer(s) before servicing.
• Never start the dryer(s) with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the dryer is properly grounded.
W001R1
WARNING
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
45. FRONT AIR DUCT
a. Remove two screws from the bottom edge of
the front panel. Refer to Figure 12.
b. Swing the bottom of the panel away from the
dryer to disengage hold-down clips and guide
lugs from cabinet top. Refer to Figure 12.
c. Disconnect wires from door switch. Refer to
NOTE: Refer to the appropriate wiring diagram
when rewiring the switch.
d. Remove lint filter out of front air duct. Refer to
NOTE: When installing lint filter, be sure to install
the filter with the words “FRONT” facing the front
of the dryer.
e. Remove four screws holding air duct to front
bulkhead and remove air duct. Refer to
Figure 21.
NOTE: When reassembling, be sure felt seal on
exhaust fan cover makes air tight seal on flange of
duct. Refer to Figure 20.
To Test Heater Assembly (Electric Models)
1. Disconnect wires from heater assembly.
NOTE: Refer to appropriate wiring diagram
when rewiring heater assembly.
2. Set meter to read Ohms. Apply meter probes to
the heater assembly terminals. Meter should
read 10.4 Ohms ± .30 Ohms cold.
Figure 21
DRY858S
AIR
DUCT
CABINET
ATTACHING SCREWS
DRY858S
SLOT
PHILLIPS HEAD
SCREWS
HEX
HEAD
SCREWS
HEX
HEAD
SCREWS
SLOT
FRONT
BULKHEAD
CABINET TOP
HOLD-DOWN
SCREWS