© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
1800000
22
Operation Instructions
Pre-Operation
Daily Check Points
1. Check to ensure all safety guards are in position
and closed.
2. Before starting, check that area is free of
obstructions that could cause safety issues.
3. Check that there are no foreign objects between
the roll and the bed.
4. Check to ensure the opening between the feed
band and finger guard is not more than .6 inch
(15 mm) and that it is working properly.
5. Check the condition of the padding.
6. If the wire stitching on the padding becomes
visible, replace the padding.
7. Check the condition of the feed bands.
8. Clean dust off machine.
9. Check for proper functioning of the emergency
stop buttons.
10. Check the machine for leaks.
Summary of Contents for UL24A118
Page 2: ......