Section 5 Service Procedures
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect all electric power to the machine and accessories before servicing.
• Close gas shut-off valve to gas dryer before servicing.
• Never start machine with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the machine is properly grounded.
• Washer motor not grounded! Disconnect electric power before servicing motor.
W502
WARNING
j. Electric Models:
(1) Remove two screws holding element and
plate to heater box, then pull element down
and away from heater box. Refer to
Figure 39.
(2) Remove all wires from terminal block.
(Refer to appropriate wiring diagram when
rewiring terminal block.)
(3) Remove screw holding terminal block to
rear bulkhead. Refer to Figure 56.
k. While supporting bulkhead, remove the four
screws holding rear bulkhead to dryer cabinet,
then lift complete assembly out of dryer. Refer
to Figure 53.
l. Remove heater duct from rear bulkhead. Refer
Figure 55
Heater
Duct
Attaching
Screws
Heater
Duct
Attaching
Screws
Heater
Duct
Rear
Bulkhead
D261SE3B