4
. Commissioning
Read carefully Chapter 1
before commissioning the repeater.
Check all connections made during the installation. Also, ensure that
both the mains plugs for repeaters equipped with two power supply units
are connected to outlets supplied from the same fuse.
To fulfill the IP65 weather protective requirements, ensure that the cable
strain relief bushings are properly tightened. Also, ensure that the
gaskets at the cable inlets and on the cabinet are properly fitted and not
damaged.
When the installation is checked, commission the repeater as described
below.
ALLGON Systems AB
ALR Compact Repeater
Commissioning
VD203 67/EN - User’s Manual
Rev. 1A 2000-07
4 - 1