061090 - 12/2013
SECTION 2
OPERATIONS
Page 2-4
Operating Instructions
To utilize your Allen Engineering MSP450 Rider to its fullest capacity the machine should be driven in
the direction the operator is facing. This will
fi
nish the widest possible area while giving the operator an
excellent view of the slab surface about to be troweled. When the machine reaches the end of the slab
make a 180 degree turn and repeat the straight line of direction to the other end of the slab. To familiar-
ize a new operator with the riding trowel the following steps should be taken.
Location of all Operating Controls
[A]
Right Pitch Control
[B]
Joystick (Forward & Reverse)
[C]
Joystick (Left & Right, Forward & Reverse)
[D]
Left Pitch Control
[E]
Right Foot Pedal
[F]
Left Kill Switch
[G]
Seat
Adjustment
[H]
Cup Holder
A
G
C
B
D
F
E
H
Summary of Contents for 060800
Page 1: ...OPERATIONS PARTS MANUAL 061090 12 2013 Riding Trowel ALSO INCLUDES 450C 05 2016 ...
Page 14: ...061090 12 2013 Page xii Dimensional Specifications ...
Page 16: ...061090 12 2013 INTENTIONALLY BLANK Page xiv ...
Page 17: ...061090 12 2013 SECTION 1 SAFETY Page 1 1 Section 1 SAFETY ...
Page 18: ...061090 12 2013 SECTION 1 SAFETY Page 1 2 State Regulations Proposition 65 Warning ...
Page 19: ...061090 12 2013 SECTION 1 SAFETY Page 1 3 Federal Regulations Respiratory Hazards ...
Page 33: ...061090 12 2013 SECTION 2 OPERATIONS Page 2 1 Section 2 OPERATIONS ...
Page 41: ...061090 12 2013 SECTION 3 SERVICE Page 3 1 Section 3 SERVICE ...
Page 57: ...061090 12 2013 SECTION 4 PARTS Page 4 1 Section 4 PARTS ...
Page 104: ...061090 12 2013 SECTION 4 PARTS Page 4 48 Electrical Schematic Illustration ...
Page 105: ...061090 12 2013 SECTION 4 PARTS Page 4 49 Electrical Schematic Illustration ...