Allen-Bradley ProcessLogix R300.1 Quick Start Manual Download Page 31

Getting Started with ProcessLogix R300.1           

31

Publication 1757-QS030A-US-P - March 2000

Enter Alarms

Double-click on the DATACQ block to display the Parameters window.

Click on the Alarms tab.

Enter these alarms:

Click on OK.

Save and exit

Save your changes by clicking on File

 ⇒

 Save.

Close the Control Module FIC102. If prompted, select Yes to save changes.

IMPORTANT

You must enter the PV High alarm first to enable the PV High 
alarm. 

type

trip point

priority

severity

PV High

85

High

0

PV High

95

Urgent

0

Allen-Bradley Drives

Summary of Contents for ProcessLogix R300.1

Page 1: ...ol Module building the Peer to Peer Block downloading the Control Module to the 1757 PLX52 Process Controller module verifying proper operation creating a PID Loop creating a Control Module building t...

Page 2: ...amples shown in this publication Allen Bradley publication SGI 1 1 Safety Guidelines for the Application Installation and Maintenance of Solid State Control available from your local Allen Bradley off...

Page 3: ...in Before you begin installing the system ensure that you have already installed the chassis and power supply installed the 1757 PLX52 Process Controller module installed the CNB module installed the...

Page 4: ...nodes ControlNet module with address 1 at slot 0 in the chassis To set the node address adjust the rotary switches on top of the module See the schematic on the right side of the module for a guide t...

Page 5: ...ne time setting and click OK Verify that all I O modules appear as configured in the chassis Exit NTOOLS by clicking on NetworkTools Exit Starting the ProcessLogix server The ProcessLogix Server progr...

Page 6: ...a Click on Oper in the bottom right of the screen You see a flashing cursor in a box in the upper right corner of the screen below the toolbar b Type mngr lower case c Press the Enter key Oper changes...

Page 7: ...Builder starts up displaying a tree view We describe the available trees in the following table this tree view shows you Project the offline copy of your project Loaded Monitoring The loaded or runti...

Page 8: ...ing a Controller The first step in configuring your hardware is to create a controller In Control Builder select File New Controller C200 Controller Realize that C200 Controller PLX52 You see the New...

Page 9: ...nsitive and click OK TIP As you enter the CPM slot number and the uplink MAC address notice the CPM and CEE name fields on the bottom half of the New Controller dialog box You will see that the CPM an...

Page 10: ...g Tab Configuring I O Modules Once you have created a controller the next step is to configure the I O modules you will use in your system Before you can configure a module you must add it from the li...

Page 11: ...e so that ProcessLogix automatic module numbering conventions work correctly 6 channel isolated analog input module 1756 IF6I 6 channel isolated analog output module 4 20 MA 1756 OF6CI or 6 channel is...

Page 12: ...the following parameters Select the Channel Configuration tab and enter the following parameters for all channels TIP IOM32 is an example of the automatic module numbering convention We will provide...

Page 13: ...R300 1 13 Publication 1757 QS030A US P March 2000 Select the Server Parameters tab and enter the following non case sensitive parameters Click on OK in this field enter Point Detail Page sysdtlaia ds...

Page 14: ...indow that is displayed select the Main tab and enter the following parameters Select the Channel Configuration tab and enter the following parameters for all channels Select the Server Parameters tab...

Page 15: ...the IOM Configuration window that is displayed select the Main tab and enter the following parameters Select the Module Configuration tab In the Filter Times fields select 1MSDELAY for all channels S...

Page 16: ...ed analog output module 1756 OB16I On the IOM Configuration window that is displayed select the Main tab and enter the following parameters Select the Server Parameters tab and enter the following non...

Page 17: ...To assign modules to the CEE From Control Builder select Tools Assign You will see the Controller Assignments window Click on the IOMs tab in the Available Modules area Select all four modules To sel...

Page 18: ...Before you begin configuring a peer to peer block ensure that you already installed RSLogix5 installed the 1771 chassis installed the 1785 L80C or equivalent installed 1771 P4S installed ControlNet t...

Page 19: ...o close the Parameter window Save your changes by clicking on File Save Notice that the new Control Module name appears in the Project Tab Close the Control Module PEER_FLAG Assigning the Control Modu...

Page 20: ...ilable EXCHANGE function blocks by clicking on the to the left of the EXCHANGE control component library in the Library tree display Select a REQFLAGARRAY block by clicking on it Move the block by dra...

Page 21: ...S P March 2000 Configure parameters On the REQFLAGARRAY block double click in the gray area You see the REQFLAGARRAY Parameters window Enter these parameters Click on the Communications tab in this fi...

Page 22: ...b Select PVFL from the Parameter list Set the Pin Position to be Output and Left Right Select Array index 0 and click Add in this field enter Path to Device 1 1 The Path to Device indicates that the p...

Page 23: ...ublication 1757 QS030A US P March 2000 Select Array index 1 and click Add Click OK to close the Parameters window Save and Exit Save your changes by clicking on File Save Close the Control Module PEER...

Page 24: ...te message displayed close the Controller Assignments window Method 2 In the Project tab click on PEER_FLAG From the Toolbar Menu click on the green down arrow to download the function block diagram C...

Page 25: ...on on using RSLogix5 Refer to RSLogix5 Help Go online by clicking on Comms Go Online Open the Data File B3 by double clicking on it Change the value of B3 0 to 1 In Control Builder in the Monitoring t...

Page 26: ...e a blank window for the Control Module in the center of your screen Rename the Control Module a Double click anywhere in the palette You see the Parameter window b In the Name field enter FIC102 Sele...

Page 27: ...creen Click on Assign The FIC102 module is displayed in the Assigned Modules list box Close the Controller Assignments window Building the PID Loop To develop the PID loop In the Project tab open the...

Page 28: ...to the Control Module Wire the blocks Double click on the source wire The cursor changes to a function block name AI Channel AI00 Dataacq DACA PID PIDA AO Channel AO00 Numeric IMPORTANT The Numeric b...

Page 29: ...the Numeric Parameters window Enter this parameter Click on OK On the PID block double click in the gray area You see the PID Parameters window Click on the Algorithm tab Enter these parameters TIP F...

Page 30: ...rs After you have selected Channel 0 click on Assign Channel and click OK On the AOCHANNEL block double click in the gray area You see the AOCHANNEL Parameters window Enter these parameters After you...

Page 31: ...rameters window Click on the Alarms tab Enter these alarms Click on OK Save and exit Save your changes by clicking on File Save Close the Control Module FIC102 If prompted select Yes to save changes I...

Page 32: ...e message displayed close the Controller Assignments window Method 2 In the Project tab click on FIC102 From the Toolbar Menu click on the green down arrow to download the function block diagram Click...

Page 33: ...parameter to ensure that it is set to MAN manual With the PID block in manual mode double click on the OP parameter and set it to 80 On the PID block double click on the MODE parameter and set it to A...

Page 34: ...rver Station Click on the text box in the upper right corner of the screen below the toolbar to view the detail screen for the do this controller 1 Type CPM0101 in the box 2 Press F12 CEE 1 Type CEE01...

Page 35: ...grams ProcessLogix Server Start Stop ProcessLogix Server b Ensure that the window is in the Full mode view To do this c Click the Database Unloaded radio button d When asked to confirm click Yes e Whe...

Page 36: ...rvices icon You see the Services dialog box c Select the PlantScape System Repository service by highlighting it d Click the Stop button to shut down the System Repository and the CDA server Shut down...

Reviews: