
POINT I/O 2 Current Output and 2 Voltage Output Analog Modules
7
Publication 1734-IN002E-EN-E - October 2016
Install the Mounting Base
To install the mounting base on the DIN rail (Allen-Bradley part number 199-DR1;
46277-3; EN50022), proceed as follows.
ATTENTION:
This product is grounded through the DIN rail to chassis ground.
Use zinc plated yellow-chromate steel DIN rail to assure proper grounding. The
use of other DIN rail materials (for example, aluminum or plastic) that can
corrode, oxidize, or are poor conductors, can result in improper or intermittent
grounding. Secure DIN rail to mounting surface approximately every 200 mm
(7.8 in.) and use end-anchors appropriately.
Module
locking
mechanism
Module
wiring
diagram
DIN rail locking
screw (orange)
Mechanical
keying
Interlocking
side pieces
Slide-in
writable
label
Handle
1734-TOP or
1734-TOPS
one-piece
terminal base
with screw or
spring clamp
45712
Modules Mounted on 1734-TOP or 1734-TOPS One-piece Terminal Base