
Rockwell Automation Publication 8720MC-RM001K-EN-P - September 2018
23
Chapter
3
Mount the 8720MC-RPS Unit
This chapter provides the system installation procedures for mounting your
8720MC-RPS unit to the system panel.
This procedure assumes that you have prepared your panel and understand
how to bond your system. For installation instructions regarding equipment
and accessories not included here, refer to the instructions that came with those
products.
Topic
Page
Mount Your 8720MC-RPS Regenerative Power Supply
SHOCK HAZARD:
To avoid the hazard of electrical shock, perform all
mounting and wiring of the 8720MC-RPS unit before applying power. Once
power is applied, connector terminals can have voltage present even when
not in use.
ATTENTION:
Plan the installation of your system so that you can perform all
cutting, drilling, tapping, and welding with the system removed from the
enclosure. Because the system is of the open type construction, be careful to
keep metal debris from falling into it. Metal debris or other foreign matter
can become lodged in the circuitry and result in damage to the components.