7
SL-90 DC CONCRETE PAD
16”
TRACK FOOTING
8”
24”
4”
7”
TOTAL COVER HEIGHT
INSTALL 4”
ABOVE GROUND
WHEN POSSIBLE
FOOTING FOR
GATE OPERATOR
LOW VOLTAGE CONDUIT
HIGH VOLTAGE CONDUIT
FRONT VIEW
TOP VIEW
24”
24”
15”
2.25”
16”
4 RED HEAD BOLTS
½”X 3 ½”
AREA FOR CONDUIT(S)
OPERATOR CONCRETE PAD
OPERATOR PLASTIC COVER
GATE TRACK
GATE
TRACK FOOTING
MINIMUM 5”
10”
11.25”
13.5”
4.5”
11.5”