background image

 

 

 

4-17

 

Algas-SDI Operation and Maintenance Manual 

– P/N – 52642 

 

Maintenance 

 

Maintenance Recommendations 

Direct  Fired  Vaporizers  are  designed  for  trouble  free  and  safe  operation.  
Because  of  the  nature  of  their  use,  and  the  severe  duty  they  receive,  it  is 
important  to  provide  scheduled  maintenance.    The  maintenance  schedule,  type 
and frequency, provided in this manual is the minimum maintenance required for 
proper and safe operation of your vaporizer.  Ambient conditions surrounding the 
vaporizer installation and LPG quality may require a more frequent maintenance 
schedule.  A list of spare parts and repair kits for proper maintenance is located 
in the Appendix section of this manual.   

CAUTION 

 

The equipment described in this manual is designed to operate with 
LP  gas,  a  flammable  fuel  under  pressure.  The  nature  of  the 
application  involves  inherent  hazards  that  could  result  in  injury. 
ONLY  a  trained  and  fully  qualified  person  should  service  this 
equipment. 

 

 

CAUTION 

 

When  servicing  a  component  in  the  liquid  or  vapor  line,  BE  SURE 
that the LP-gas supply is shut off to that component before removal 
or  disassembly.    Vaporizer  must  be  completely  purged  before 
performing  service.    Be  sure  that  ALL  sources  of  ignition  are 
extinguished within 25 feet (7.6 m) of the work area. 

When flaring the contents of the vaporizer, be sure that the burners 
are on to prevent freezing during the flaring operation. 

 

 

Table 5 

– Initial Installation and Operation Inspections 

Required 30-60 days after initial installation 

Component 

Action Required 

Inlet Strainer 

Inspect  strainer  and  remove  accumulated  debris.  NOTE:  if  debris  accumulation  is 
heavy check every 3-6 months or more frequent as required.   

Main Burner 
Assembly 

Check orifices and air supply openings on the burner tips for debris or foreign objects.  
If  needed,  clean  any  plugged  or  obstructed  orifices  before  restarting  the  vaporizer. 
NOTE:    In  some  applications  vaporizer  may  be  installed  in  an  environment  where 
excessive  amounts  of  dust  or  debris  are  present.    When  vaporizer  is  located  in  this 
type  of  an  environment,  it  may  be  necessary  to  check  the  burner  tips  on  a  frequent 
basis to ensure proper operation and capacity of the vaporizer.   

Drip Leg 

Check the vaporizer drip leg, and any others present in the installation, for heavy ends 
and oil build-up.  If present, first ensure there are no sources of ignition within 25 feet 
(7.6 m), and then drain heavy ends.  NOTE:  In areas where LPG quality is poor it may 
be  necessary  for  drip  legs  to be  checked  for  heavy  ends  more  frequently  (monthly  or 
bi-monthly depending on quality of LPG). Once it is verified that no significant quantity 
of  heavy  ends  is  accumulating  during  vaporizer  operation,  this  maintenance  can  be 
performed on an annual basis. 

Summary of Contents for Direct Fired 120/60H

Page 1: ...ttle Washington USA 98108 Tel 1 206 789 5410 Fax 1 206 789 5414 Web www algas sdi com FILE MANUAL PN 52642 DIRECT FIRED 5 10 21 Innovative liquid vaporizing and gas mixing solutions LP Gas Vaporizer 4...

Page 2: ...This equipment uses LPG a flammable fuel handled under pressure Inherent hazards exist and a thorough understanding of the equipment is required to allow safe operation and maintenance Allow only a TR...

Page 3: ...ack charges for work performed by others upon or in conjunction with ASDI equipment unless prior authorization is given by means of an Algas SDI International LLC purchase order Algas SDI Internationa...

Page 4: ...This page left intentionally blank...

Page 5: ...al hazard which can result in severe personal injury or death Use extreme care and follow the instructions given ELECTRICAL DISCONNECT REQUIRED Indicates a potentially dangerous situation which can re...

Page 6: ...This page left intentionally blank...

Page 7: ...ecommended Liquid Supply Line Size 2 6 Vapor Distribution Line 2 6 Table 3 Recommended Vapor Distribution Line Size 2 6 Liquid Inlet 2 7 Vapor Bypass Line Optional 2 7 Burner Supply Line Optional 2 8...

Page 8: ...g burner input pressure 4 22 Figure 12 Adjusting burner input pressure 4 22 Liquid inlet valve maintenance procedure 4 23 Capacity control valve maintenance procedure 4 25 5 Troubleshooting Pilot 5 26...

Page 9: ...This page left intentionally blank...

Page 10: ...ntact Algas SDI with total connected load and high pressure first stage regulator setting See Page 2 9 for Details Economy Valve Kit Economy Valve Kit P N 41051 Quantity 1 per unit See Page 2 8 for De...

Page 11: ...ame directly applied to the heat exchange surface which in turn contacts the LP Gas liquid that is to be vaporized Algas SDI Direct Fired vaporizers consist of seven 7 main components Liquid inlet val...

Page 12: ...flow into the heat exchanger and the thermostat will sense the cool liquid and cycle the main burner s on During continuous operation the burner s will cycle on and off to maintain the required suppl...

Page 13: ...kW THERMOSTAT PORT PRESSURE 10 W C 24 9 mbar BURNER PRESSURE 9 W C 22 4 mbar 80 40H 102 720 BTU hr 30 kW THERMOSTAT PORT PRESSURE 9 W C 22 4 mbar BURNER PRESSURE 7 W C 17 4 mbar 120 60H 154 080 BTU hr...

Page 14: ...arefully open package inspect unit for damage and remove all plastic shipping material and wood shipping base from the vaporizer INITIAL ASSEMBLY Install the Flue cap s on the top of the unit with the...

Page 15: ...nance Manual P N 52642 2 5 Figure 2 Vaporizer Dimensions shown in inches Model A B C 40 40H 35 0 89 m 29 0 74 m 20 0 51 m 80 40H 35 0 89 m 29 0 74 m 20 0 51 m 120 60H 44 1 12 m 37 0 96 m 28 0 75 m 40...

Page 16: ...adequately sized for the service Table 2 Recommended Liquid Supply Line Size Nominal Pipe Size Liquid Line Length Ft m Up to 50 15 50 150 15 36 150 250 36 76 40 40H Vaporizers 3 4 DN20 1 DN25 1 DN25...

Page 17: ...nd the vaporizer Liquid must be able to flow both ways in that line 1 Install the 60 mesh 3 4 strainer that is supplied with the unit on the liquid inlet to the vaporizer 2 Install a UL listed shut of...

Page 18: ...INSTALLATION OPTIONAL A vaporizer with economy operation draws vapor from the tank as the primary source and utilizes the vaporizer only when needed The intent is to allow the most economical operati...

Page 19: ...To properly size the FILTAIRETM contact Algas SDI with total connected load and high pressure first stage regulator setting INSTALLING MULTIPLE UNITS IN PARALLEL For balanced performance of the system...

Page 20: ...52642 AN OVERSIZED INLET AND OUTLET MANIFOLD MAY ALSO BE USED TO BALANCE THE FLOW Figure 6a Installing Multiple Units in Parallel Oversized Manifolds with side inlet outlet Figure 6b Installing Multip...

Page 21: ...2 120 60H 77 1 497 23 7 153 LEAK TEST CAUTION Leak test the entire installation prior to operating the system 1 Close the outlet valve 2 Slowly open the inlet valve and allow pressure to equalize in t...

Page 22: ...for vent location and thread size Always pipe away regulator vents to a safe location with no source of ignition Ensure vents are not blocked with debris NOTE For installations or locations in Canada...

Page 23: ...aporizer see page 2 8 open the valve supplying gas to the burner supply regulator 4 Turn the temperature control dial on the thermostatic gas control valve counterclockwise to the RUN position RUN pos...

Page 24: ...y cycle off 8 Make sure all the valves on consuming equipment are closed and slowly open the valve in the vapor distribution line Open all consuming equipment valves Direct Fired Vaporizer setpoint ad...

Page 25: ...izer purge procedure If the vaporizer is not going to be used for a long period of time it should be purged The information contained below is a step by step procedure on how to purge Algas SDI direct...

Page 26: ...sume the remaining gas in the line 7 After verifying the pressure in the lines is zero and no sources of ignition are present in the area the vaporizer can now be disconnected AUTOMATIC RE IGNITION OP...

Page 27: ...area When flaring the contents of the vaporizer be sure that the burners are on to prevent freezing during the flaring operation Table 5 Initial Installation and Operation Inspections Required 30 60 d...

Page 28: ...Clean any plugged or obstructed orifices Pilot Flame Guide Flame Spreader Bar Upon initial installation and during periodic maintenance inspections check for corrosion on the ends of the pilot flame...

Page 29: ...hat no significant quantity of heavy ends are accumulating during vaporizer operation this maintenance can be performed on an annual basis Drip Leg Remove plug below the tee on the drip leg and drain...

Page 30: ...aling properly 7 Capacity Control Valve Repair Kit installed Piston and valve body cleaned 8 Strainer Screen inspected for tears or holes and or cleaned 9 Relief Valve Inspected for corrosion Is rain...

Page 31: ...attery access door on the bottom right corner of the thermostat housing Figure 10 Opening the battery access door 2 Pull out the battery disconnect it and replace with new 9VDC battery Push the batter...

Page 32: ...e the temperature control dial counterclockwise The main burner s should now engage 5 With the main burner operating check the gas pressure at the thermostat outlet pressure port using a manometer see...

Page 33: ...ype material to remove any debris and or oils from the orifice surface 8 Replace the O ring under the orifice use smallest O ring from kit Lightly grease new O ring before replacing it 9 Once the inle...

Page 34: ...re present the valve is sealing properly 16 Remove any remnants of the old inlet valve flange gasket from the surface of the flange on the inlet valve itself and on the flange at the heat exchanger In...

Page 35: ...the top center of the piston This will allow you to have leverage and grasp the screw with a pair of pliers to remove the piston from the valve 4 Remove the old O ring from the piston and replace it...

Page 36: ...spacing from the hood is not greater than 1 8 3 mm Check if the spark electrode is saturated with moisture water Wipe any moisture water or light the vaporizer manually with a torch to dry it Check t...

Page 37: ...ON DOWN PRESSURE IS OK PRESSURE IS HIGH LOW ADJUST REGULATOR VERIFY YOU HAVE A MINIMUM OF 6 PSIG INPUT TO REGULATOR DETERMINE CAUSE OF LOW PRESSURE AND REPAIR NO PRESSURE REPLACE REGULATOR PRESSURE IS...

Page 38: ...THE PILOT IS IMPINGING ON THE THERMOCOUPLE BULB APPROXIMATELY 3 8 TO 1 2 9 to 13 mm CHECK THE THERMOCOUPLE SIGNAL TO THERMOSTAT CONTROL VALVE SIGNAL SHOULD BE 13 TO 30 mV DC WHEN THERMOCOUPLE IS HOT R...

Page 39: ...Y BATTERY OK BATTERY DEAD REPLACE BATTERY CHECK IF ELECTRODE IS CONTACTING HOOD OR FURTHER THAN 1 8 3 mm ADJUST AND CHECK OPERATION OUT OF POSITION OK CHECK ROCKER SWITCH BY REMOVING LEADS AND TOUCHIN...

Page 40: ...THAT THE PILOT IS IMPINGING ON THE THERMOCOUPLE BULB APPROXIMATELY 3 8 TO 1 2 9 to 13 mm TURN THE THERMOSTATIC GAS VALVE TEMPERATURE CONTROL DIAL UP TO THE HIGHEST SETTING DID THE CONTROL CLICK CHECK...

Page 41: ...ASSUMES THAT THE LOAD ON THE VAPORIZER IS LESS THAN ITS MAXIMUM CAPACITY NO ADJUST BURNER PRESSURE REGULATOR OK SEE TROUBLESHOOTING TREE 3 MAIN BURNER WILL NOT LIGHT WILL NOT ADJUST CHECK FOR MINIMUM...

Page 42: ...APPENDIX A TECHNICAL INFORMATION...

Page 43: ...Figure 13 40 40H Vaporizer Replacement Parts 1 2 3 4 5 6 10 8 9 11 12 13 14 15 16 24...

Page 44: ...Figure 14 80 40H and 120 60H Vaporizer Replacement Parts NOTE Drawing shown for an 80 40H Vaporizer 17 18 19 20 25 26 9 16 4 8 11 13 15 2 5 12 3 14...

Page 45: ...VALVE CAPACITY CONTROL VALVE 21 Piston 23 Inlet valve gasket 23 Inlet valve seat 23 Inlet valve spring 23 Inlet valve cap o ring Inlet valve orifice 23 Pivot arm gasket 22 Piston o ring 22 Capacity co...

Page 46: ...Tube kit burner supply All models P N 42012 14 Tube kit capacity control All models P N 42013 15 Tube kit pilot supply All models P N 42014 16 Vent cap assembly All models P N 1501 4015 17 Burner mani...

Page 47: ...ice qty 10 34800 Burner supply regulator 3 0034 Repair kit 40 40H Part number Description 40764 Repair kit Liquid inlet valve Capacity control valve 41073 Thermostat Thermowell with 9 VDC reigniter 40...

Page 48: ...for all models 37510 Orifice pilot burner 80 40H 120 60H 23 41041 Repair kit 120 60H Pilot orifice and thermocouple Part number Description 37050 Thermocouple for all models 37510 Orifice pilot burne...

Page 49: ...inlet valve pin gasket installation procedure 1 Clean pivot screw hole opening from any residue 2 Apply blue medium strength Locktite 243 or Permatex to threads on the liquid inlet valve body or pivot...

Page 50: ...lide pin gasket P N 8135 101 over the pivot screw P N 3 4169 threads as shown in the picture 4 Screw in pivot screw to the inlet valve body and apply 8 in lbs 0 9 Nm of torque approximately 1 8 full t...

Page 51: ...ite to properly dry before reinstalling valve assembly back on the vaporizer 7 Re install valve in vaporizer with new flange gasket and uniformly torque bolts to 30 35 ft lbs 40 7 47 5 Nm 8 Re connect...

Page 52: ...HEAT INPUT 51 360 BTU HR 54 185 KJ HR 8 9 USE THE 1 8 FNPT PORT TO PIPE AWAY 1ST STAGE VENT IF REQUIRED 10 USE THE 3 4 FNPT PORT TO PIPE AWAY 2ND STAGE VENT IF REQUIRED 11 APPROXIMATE SHIPPING WEIGHT...

Page 53: ...E FOUR MOUNTING HOLES ON 7 ABOVE GROUND LEVEL SOLID NON COMBUSTIBLE BASE HEAT INPUT 102 720 BTU HR 108 370 KJ HR 8 USE THE 1 8 FNPT PORT TO PIPE AWAY 1ST STAGE VENT IF REQUIRED 9 USE THE 3 4 FNPT PORT...

Page 54: ...PANE INLET CONDITION 6 120 GPH 240 KG HR VAPORIZER TO BE SECURED THROUGH THE FOUR MOUNTING HOLES ON 7 ABOVE GROUND LEVEL SOLID NON COMBUSTIBLE BASE HEAT INPUT 154 080 BTU HR 162 555 KJ HR 8 USE THE 1...

Page 55: ......

Page 56: ...Algas SDI International LLC 151 South Michigan Street Seattle Washington 98108 Ph 1 206 789 5410 Fax 1 206 789 5414 www algas sdi com...

Reviews: