
20
Eve Double Pro-line | Version 1.0 | June 2020
ENGLISHENGLISH
Installing the charging station
REMARK
Verify the indicated measures with a tape measure.
The distances between the drill holes are 123.8 mm
(top side), 39.6 mm (bottom site) and 434.3 mm (vertical).
1.
Place the mounting block at the desired location.
2.
Use a spirit level to level the mounting block.
3.
Use the pencil to mark the drill holes.
4.
Drill the holes at the marked points.
5.
Verify the drill holes.
Installing the mounting block
1.
Push fitting wall plugs into the four drill holes.
2.
Attach the mounting block on the wall by using two
screws in the two bottom drill holes.
Installing the charging station
1.
Place the casing onto the already installed mounting
block, in a vertical downward movement.
2.
Use the pencil to mark the drill holes.
3.
Drill the holes at the marked points.
4.
Verify the drill holes.
5.
Attach the casing on the top side with two screws
at the right position (ref. image 3).
Image 3: Wall mounting
3.3.3 Mounting post: Install the post with the concrete
pedestal or metal pedestal (accessory)
•
1x Groundwire (0,45 m)
•
1x Cable lug
•
4x Cros head bolt M8x30
•
4x Six-sided M10x25
•
4x Spring washer M10
•
4x Washer M10
•
1x Sloted head bolt M4x12
•
Washer M4
•
1x bolt M8x20 Stainless A2 anti-theft
•
4 x Tap bolt M10x25
1.
Dig a hole of approx. 50x50cm with a depth of 65cm.
2.
Place the concrete or metal pedestal in this hole.
3.
Attach the post on the pedestal with four threaded
bolts M10x25 mm and the corresponding rings (ref.
image on the cover or the pedestal’s installation
manual).
4.
Attach the mounting block with two screw bolts
M8x40 mm.
5.
Attach the charging station on the post with two
screw threads M8x40 mm.
6.
Attach the ground wire on the post with M4x12 mm
screw and an M4 washer.
7.
Guide the ground wire through one of the glads into
the charging station an connect the ground wire to the
terminal block (Pos. 15, page 3) and then mount the
ground wire to the post under the appropriate bolt.
(ref. image 4)
8.
Attach the cover plate to the post with the anti-theft
bolt M8 x 20 mm (ref. image 4).
9.
Refill the hole in which the pedestal is placed and
level the surface.
10.
Once completed, cover the area with a levelled
protection such as tiles.
Image 4: Fixing the cable cover
3.4 Electrical installation
WARNING
Carefully read and follow all safety instructions in this
manual!
DANGER!
The electric system must be completely disconnected from
every power supply prior to carrying out installation and
maintenance work!
1.
Pull the power cable through the cable inlet,
(
5
on page 2).
2.
Pull the power cable at least 15 cm into the housing
3. INSTALLING AND CONNECTING