10
6.Install Teflon tube
Let the lead screw snap into the
coupling and the motor shaft is also
aligned with the lead screw. Tighten
the top wire
Adjust the screw movement by adjusting
these two screws. The two screws cannot
be tightened too tightly. Turn the
coupling by hand to adjust the
movement of the lead screw.
note
Teflon tube
and
line
direction
Summary of Contents for U30 Pro
Page 1: ...0 U30 Pro operating instruction Alfawise...
Page 10: ...7 Box side up...
Page 11: ...8 The tension of the belt can be adjusted by the two screws on the box...
Page 16: ...13 11 Mounting rack and glass 12 Assembly completed...
Page 21: ...18 2 Home interface Print file parameter information Pause Cancel...
Page 24: ...21 cooling restore Distance ajustment reduce increase stop cooling restore...
Page 25: ...22 5 Utilities interface Automatic leveling control Consumable setting control...
Page 27: ...24...
Page 28: ...25 6 Print interface File selection and display Start scroll Select the display of the file...
Page 29: ...26 26 C Cura installation and operation software...
Page 30: ...27 27...
Page 31: ...28...
Page 32: ...29 1 Slice software offline printing instructions...
Page 33: ...30...
Page 34: ...31...