24 

 

  
  
  
  
  
Er41   

  
  
     
    
The minimum primary air flow in 
the Check Up Phase has not been 
achieved 

The presence of some 
obstacle or large 
impurities in the primary 
air inlet pipe 

  
  
  
Wait for the boiler to 
turn down and then 
press the P2 key for 
more than 3 
seconds  

Check and clean the 
primary air inlet pipe 

Check how dirty the 
flue pipe and  
chimney are and 
their draught 

Flue pipe obstructed 

  
The door not closed well in 
the Ignition Phase 

Check that the door 
of the chamber 
closes well 
Contact the 
maintenance staff  

  
  
Er42  

  
The primary air flow is greater than 
the maximum allowed value 

  
  
Too large inlet air 

  
Wait for the boiler to 
turn down and then 
press the P2 key for 
more than 3 
seconds 

Check the primary 
air inlet pipe 
Check how dirty the 
flue pipe and 
chimney are and 
their draught 
Contact the  
maintenance staff  

NOTE: If the recommended solution to the problem does not remove the direct cause of the alarm, YOU MUST CONTACT “ALFA 
PLAM” CALL CENTRE or the nearest authorized maintenance service centre. 
 

 

INFORMATION ON THE DISPOSAL AND DISASSEMBLY OF THE BOILER  

 

The owner of the boiler is responsible for its disposal and disassembly (as a waste material). 
The owner must comply with the applicable regulations of the country in which the boiler is being disposed of for the sake 

of safety and environmental protection. The disposal of the boiler can also be entrusted to a third person who is licensed for 
such activities. 

INDICATION: In any case, you must comply with the laws of the country in which the pellet boiler is installed. 

 WARNING: All disassembled parts intended for destruction must be properly removed: 

- Remove all electrical parts, 
- Separate the battery from the electronic system, 
-Dispose of the battery separated from the electronic system in provided containers in accordance with the norms, 
- Separate the base of the boiler and take care of it as scrap. 

  

 WARNING: If you dispose of the boiler in the environment, it may become a serious danger to people and animals. 

The owner of the boiler is always responsible for the resulting damage. 

When the boiler is disposed of, it is necessary to take care of the CE mark, Operation Manual and all other installation related 

documents. 
 

 

TECHNICAL CHARACTERISTICS OF COMMO COMPACT 32 PELLET BOILER  

 

Characteristic name  

Value  

Reduced 
(minimum) 
 

Nominal (maximum)  

*Boiler power (kW)  

9.8  

31.7  

*Utilization rate (%)  

93.6  

90.34  

Consumption of pellets per hour kg / h 

2.13  

7.14  

CO emissions (at 10% O2) (%) 

0.008  

0.032  

Flue pipe connection (mm)  

Ø100  

Boiler Class  

Class 5  

Weight (kg)  

360 - 380  

Fuel  

pellet  

Pellet tank (kg)  

~ 70  

Voltage (V)  

220-230  

Frequency (Hz)  

50  

Electricity consumption while boiler operates at nominal power (W)  

53  

Electricity consumption while boiler operates at reduced power (W)  

37  

Electricity consumption during boiler Ignition Phase (W)  

310  

Electricity consumption during boiler Standby Phase (W)  

 

Necessary draught at the nominal boiler power (mbar)  

0.103  

Summary of Contents for COMMO COMPACT 32

Page 1: ...COMPACT 32 Installation Operation and Maintenance Manual This product meets the requirements of the Ecodesign Directive in terms of efficiency and air pollution level in order to contribute to the re...

Page 2: ...ACCUMULATING BOILER ETC 18 LITRE EXPANSION TANK ENOUGH FOR 37 5 KW HEATING POWER AUTOMATIC AIR VENT VALVE SET ON THE HOT WATER OUTLET FROM THE BOILER SAFETY VALVE INSTALLED ON THE HOT WATER OUTLET FRO...

Page 3: ...IONAL MAINTENANCE 10 CHARACTERISTIC BUILT IN ELEMENTS 11 CIRCULATION PUMP 11 EXPANSION TANK 11 FILL AND DRAIN COCK 11 ELECTRONIC SYSTEM 11 NON RETURN VALVE AUTOMATIC AIR VENT VALVE SAFETY VALVE AND WA...

Page 4: ...Pellet boiler hydraulic installation diagram radiator and floor heating 27 Pellet boiler hydraulic installation diagram accumulation tank 28...

Page 5: ...approach the boiler while in operation with the intention of playing This appliance can be used by children aged 8 and older and persons with reduced physical sensory or mental abilities if they are...

Page 6: ...this document The installer is to check whether the air supply pipes correspond to the type of the installed boiler The electrical connections must not be executed with the use of temporary and or uns...

Page 7: ...east 100 cm2 or bigger The boiler operates at 220 230 V 50 Hz Ensure that the electrical cables do not go under the boiler that they are away from hot surfaces and that they cannot come in contact wit...

Page 8: ...the qualified chimney sweep Flue gases can be discharged directly into the chimney only if it has a cap for the purposes of inspection and cleaning and if its cross section is up to 20 x 20 cm i e if...

Page 9: ...for a longer distance In this case the length is up to 8m INSULATION AND DIAMETER OF THE OPENINGS ON THE ROOF Once the position of the boiler has been determined it is necessary to make a hole i e an...

Page 10: ...Grounding is prescribed by the law Under no circumstances may the electrical cable be exposed to a temperature above 80 C The power cable is part of the equipment that is supplied with the boiler It i...

Page 11: ...uality and do not use any other types of fuel Inform all users on possible risks and hazards and show them how to handle the pellet boiler If the boiler is placed on a wooden floor it should be insula...

Page 12: ...ing value min 16 9 MJ kg or 4 7 kWh kg ash content below 0 7 DO NOT use the boiler for burning garbage Always take care of maximum safety GUIDELINES FOR SAFE IGNITING AND CLEANING THE BOILER NEVER use...

Page 13: ...l forward and by lowering it Figure 12b Take the upper ashtray out and pour the ashes into the garbage bin Then clean the ashtray and the space around the ashtray in the boiler with the vacuum cleaner...

Page 14: ...er clarifications The manufacturer does not have direct supervision over the work of the installer and cannot guarantee for the performed works or maintenance works In no case does the manufacturer as...

Page 15: ...e careful when connecting to a heating installation so that it does not rotate When the pump does not operate for a long period of time there is a risk that the pump shaft jams and cannot start at the...

Page 16: ...to the valve you must take the right side off when facing the boiler Valve safety cap should be loose not too tight so that the air could freely leave 7 4 5 3 SAFETY VALVE The safety valve is with R1...

Page 17: ...firemen In order to preserve safety and proper functioning of the pellet boiler do not use chopped wood Do not use the boiler for burning garbage THE PELLET QUALITY IS VERY IMPORTANT The pellet quali...

Page 18: ...system BOILER CONTROL SYSTEM The boiler has an advanced control system that allows safe efficient and reliable operation control and maximum functional utilization of the boiler It is characterized b...

Page 19: ...outlet has been activated L4 Additional motor Led light is on Additional motor has been activated L5 Aux 2 outlet Led light is on Aux 2 outlet has been activated L6 Aux 3 outlet Led light is on Aux 3...

Page 20: ...ode Link Error This message informs you that there is no communication between the LCD display and the controller in the boiler Standby Man This message appears if the system is in Standby Mode after...

Page 21: ...eters Chrono Menu for selecting modality of the Chrono Program and boiler turn on off time Manual Load Menu for manual loading of the auger It is only feasible when the system is in the OFF state Time...

Page 22: ...50 U04 1380 U05 1610 U06 1840 U07 2070 U11 1030 Note The calibration of the auger and flue gas motor should not be carried out without prior consultation with the authorized maintenance staff or repre...

Page 23: ...hrono Program By entering the Chrono Menu you see two submenus Modality and Programming Press the P4 and P6 keys to choose one of the submenus and then enter it by pressing the P3 key When you enter t...

Page 24: ...pressing the P4 and P6 keys the hours minutes years months and days are set By pressing the P3 key you enter the change mode and by pressing the P4 and P6 keys you change the value If you press the P...

Page 25: ...lighter Ignition Preload At this stage pellets are preloaded i e the auger loads a certain quantity of pellets that is necessary for ignition At this stage the lighter auger and flue gas motor are act...

Page 26: ...The minimum duration of this phase is 300 seconds and the flue gas temperature needs to be less than 70 C in order to extinguish the furnace completely OFF In this phase the boiler is extinguished flu...

Page 27: ...he furnace to extinguish and then press the P2 key for more than 3 seconds Check the condition and quality of the used pellet The appropriate flue gas temperature has not been reached during the Ignit...

Page 28: ...an also be entrusted to a third person who is licensed for such activities INDICATION In any case you must comply with the laws of the country in which the pellet boiler is installed WARNING All disas...

Page 29: ...r mg m3 26 2 Flue gas mass at nominal power kg s 0 0175 Flue gas mass at reduced power kg s 0 0072 Maximum operating water pressure bar 2 Maximum operating water temperature C 80 Boiler capacity l 68...

Page 30: ...COMMO CONTACT 32 BOILER HYDRAULIC INSTALLATIONS DIAGRAM OF COMMO CONTACT 32 PELLET BOILER In order to reduce the risk of condensation install a three way mixing valve with a pipe thermostat when insta...

Page 31: ...ydraulic installation diagram radiator and floor heating Legenda 1 Pellet boiler 2 Three way mixing valve with pipe thermostat Legenda 1 Pellet boiler 2 Hydraulic separator 3 Circulation pump 4 Three...

Page 32: ...aulic installation diagram accumulation tank Legend 1 Pellet boiler 2 Air vent 3 Safety valve 3 bar 4 Air vent 5 Circulation pump 6 Three way mixing valve with pipe thermostat 7 Accumulation tank BUFF...

Reviews: