background image

7 Technical data

It is important to observe the technical data during installation, operation and maintenance.
Inform personnel about the technical data.

7.1

Technical data

TECHNICAL DATA
Pump
Type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Grundfos CRI vertical multistage
Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . See table page 14
Mechanical seal . . . . . . . . . . . . . . . . . . . . . Single shaft seal, C/SiC, Viton
Motor

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Standard NEMA 180TC framed with totally enclosed fan cooled. 2 poles = 3600 rpm at 60

Hz, IP 55, insulation class F. Energy effieciency IE2

Control panel
Type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . On/Off/Reset with internal timer
Power rating . . . . . . . . . . . . . . . . . . . . . . . . . See table
Mains voltage . . . . . . . . . . . . . . . . . . . . . . . . 240/480 dual voltage
On/off . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Local mains disconnect
Insulation class . . . . . . . . . . . . . . . . . . . . . . NEMA
Timers

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Internal adjustable.1 min - 1+ hours

PHYSICAL DATA
Materials

Product wetted steel parts . . . . . . . . . . AISI 304, AISI 304L
Other non-wetted steel parts . . . . . . . Cast iron
Finish . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Semi bright
Product wetted seals

. . . . . . . . . . . . . . . EPDM rubber

Operating pressure and temperature

Max. inlet/outlet pressure . . . . . . . . . . . 14 bar (200 psi)
Temperature range, wetted parts . . . -10°C to 95°C (max. temperature)
Ambient temperature range, wetted
parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -10°C to 45°C

Process connection

Inlet and outlet . . . . . . . . . . . . . . . . . . . . . . . 1 1/4 inch flange/DIN11851 (2nd series) unions

Weight

12 gpm system . . . . . . . . . . . . . . . . . . . . . . 111 kg (245 lbs)
19 gpm system . . . . . . . . . . . . . . . . . . . . . . 113 kg (250 lbs)

13

Summary of Contents for GJ Tote Blast Station

Page 1: ...First published XXXX XX ESE03473 EN1 2016 12 Original manual Instruction Manual Alfa Laval GJ Tote Blast Station...

Page 2: ......

Page 3: ...Marking 6 4 Installation 7 4 1 Unpacking delivery 7 4 2 Tools and materials 7 4 3 System layout 8 4 4 Pump and control panel mounting 9 4 5 pump set up 10 4 6 Pump priming 11 4 7 Electrical set up 11...

Page 4: ...onformity with the following directive with amendments Machinery Directive 2006 42 EC DS EN ISO 12100 2011 The Pressure Directive 97 23 EC According to its own volume and the rated pressure range the...

Page 5: ...ing the Alfa Laval GJ Tote Blast Station 2 1 Important information WARNING Indicates that special procedures must be followed to avoid serious personal injury CAUTION Indicates that special procedures...

Page 6: ...ltistage centrifugal pump with motor control panel a x50 hose and all the necessary fittings and hardware required for permanent installation The system also comes with a threaded inlet adapter that c...

Page 7: ...aise it upright and remove from the box In some cases eye bolts may be needed to move the pump The mechanical hoist must also be used to position the pump into place for mounting Remove the packaging...

Page 8: ...e NOTE Use four 4 vibration resistant wedge stud anchors or equivalent to mount the vertical multistage pump For all electrical work including mounting positioning and wiring of all system components...

Page 9: ...nting holes onto the floor Be sure to take into account the direction of the flow of the pump so that the suction hose and discharge hose can be properly routed Step 2 Move the pump out of the way to...

Page 10: ...flow arrow located towards the bottom of the pump Then with the flange gasket in between the two flanges install the four flange bolts and nuts NOTE DO NOT TIGHTEN All four flange bolts must be snug f...

Page 11: ...7 Electrical set up Alfa Laval recommends that all electrical work be done by a professional electrician using the proper industry standards The electrical diagram for the control panel can be found...

Page 12: ...the timer on the control panel see appendix for timer instructions to the desired cleaning time and press the green button on the control panel to start If there is an emergency the operator can stop...

Page 13: ...with internal timer Power rating See table Mains voltage 240 480 dual voltage On off Local mains disconnect Insulation class NEMA Timers Internal adjustable 1 min 1 hours PHYSICAL DATA Materials Prod...

Page 14: ...o observe the technical data during installation operation and maintenance Inform personnel about the technical data 7 2 Pump curves at 60 Hz Flow rate Pump model Power rating 12 gpm CRI 3 19 3 HP 2 2...

Page 15: ...tarting and while operating the Tote Blast Station 8 2 Service and Repair Upon every return of a product no matter if for modifications or repair it is necessary to contact your local Alfa Laval offic...

Page 16: ...s the responsibility of the user of this document to comply with all applicable intellectual property laws Without limiting any rights related to this document no part of this document may be copied r...

Reviews: