15
4. Maintenance
Recommended spare parts:
Service kits (see chapter 6)
Order service kits from the service kits list (see chapter 6)
Ordering spare parts:
contact the Sales Department
Diaphragms
O-ring
Preventive maintenance
Replace after 12 months
Replace when replacing the
diaphragms
Maintenance after leakage
Replace by the end of the day
Replace when replacing the
(leakage normally starts slowly)
diaphragms
Planned maintenance
- Regular inspection for leakage
Replace when replacing the
and smooth operation
diaphragms
- Keep a record of the valve
- Use the statistics for planning
of inspections
Replace after leakage
Lubrication
:
(Before assembly)
- Guide:
Molycote longtherm 2 Plus.
- Sectors:
Molycote 111.
- Threads:
Molycote TP42.
Maintain the valve carefully.
Study the instructions carefully and pay special attention to the warnings!
Always keep spare diaphrams and o-rings in stock.
Step 1
4.1 General maintenance
Step 2
Atmospheric
pressure
required!
Burning danger!
-
Always
observe the technical data (see chapter 5).
-
Always
disconnect the compressed air before service.
NOTE!
All scrap must be stored/discharged in accordance with current rules/directives.
-
The valve must
never
be hot when servicing it.
-
The valve and the pipelines must
never
be pressurised
when servicing the valve.