,VVXH 0D\
,QVWDOOWKH&3(
:KHQWRXVH
Use this procedure to install the 7130 RG 5Ve.A2000/7130 RG 5Ve.B2000, that means to
make the connections to the network (wireless traffic via WLAN included), to the devices
which may be for example a notebook, laptop or computer and to the power supply. In
addition use the procedure to establish a TCP/IP connection from the device to the CPE.
The following figure shows the CPE with all external connections established. This will be
described step by step in the procedure below.
)LJXUH 2YHUYLHZDERXWDOOH[WHUQDOFRQQHFWLRQV
6\VWHPUHTXLUHPHQWVDQGVDIHW\JXLGHOLQHV
1. The CPE should be located in a cool dry place, with at least 5 cm (2 in.) of space on all
sides for ventilation. Place the CPE out of direct sunlight, and away from heat sources
or areas with a high amount of electromagnetic interference.
2. For power supply, the CPE requires 15 V DC via the included AC power adapter. The
power adapter is designed for a 230 V AC connection.
3. Do not spill liquid of any kind on this CPE.
4. The CPE is a plug-and-play unit and does not need any configuration or maintenance.