Albion TMV3 Installation & Operating Manual Download Page 5

5

TMV3 ART 33 Screwed Rev 1

Assembly Procedure

• 

The valve body is clearly marked with “C” and a blue indicator for cold and “H” and a red  

 

indicator for hot.

• 

The use of sealing compounds is not recommended.

• 

Before installation, the hot and cold-water inlet of the mixing valve must be clear of debris.  

 

the valve must be correctly connected to the respective supplies.

• 

Isolation valves must be fitted adjacent to the valve inlet. A Pressure reducing valve (PRV)  

 

must be fitted if deemed necessary.

• 

Check the main valve assembly bores are free of debris and the end sealing faces are    

 clean.

• 

Check the two tailpieces and confirm they are complete with union nuts and compression  

 

nuts with olives.

• 

Insert the sealing washer into the inlets and outlet and screw the inlet and outlet fittings  

 

onto the valve body, taking care not to over tighten.

• 

Remove the compression nuts and olives from the tailpieces. Locate the inlet filter screens  

 

and insert them into the bore of the tailpieces up to the shoulder.

• 

Assemble the valve to the pipe work and ensure the hot and cold-water pipes have full   

 

penetration into the tailpieces. The compression fittings supplied allow for direct   

 

 

connection to BS 22mm OD tube or BS 15mm OD tube.

Summary of Contents for TMV3

Page 1: ...Albion Valves UK Ltd www albionvalvesuk com Email sales albionvalvesuk com Tel 01226 729900 TMV3 ART 33 Screwed Rev 1 TMV3 Installation Operating Manual ART 33 Screwed Thermostatic Mixing Valve...

Page 2: ...e Estates NHSE Health Guidance Note HGN makes reference to three types of valve Type 1 o Having both flow control and user adjustment of mixed water temperature Type 2 o Having flow control and pre se...

Page 3: ...terial Directory 3 Technical Specification Factory Temperature Setting 42 C Temperature Adjustment Range 30 C 48 C Mix Temperature Stability 2 C Cold Water Supply Temperature 5 C 25 C Hot Water Supply...

Page 4: ...Bar 10 10 Hot Cold Pressure Bar 1 0 5 0 0 2 1 0 Hot Supply Temperature C 55 65 55 65 Cold Supply Temperature C 5 20 5 20 Mix Water Temperature C Maximum 46 Maximum 46 Temperature Differential C 12 12...

Page 5: ...lve assembly bores are free of debris and the end sealing faces are clean Check the two tailpieces and confirm they are complete with union nuts and compression nuts with olives Insert the sealing was...

Page 6: ...at the product be adjusted on site Prior to commencing commissioning the following checks should be carried out The designation of the TMV matches the application The supply pressures and temperatures...

Page 7: ...dition and reset it to the correct temperature 0 2 C Do not set a valve with a lowered temperature as this will not provide consistent operation After adjustment replace the cap to lock the valve in p...

Page 8: ...results e g 1 C record the change and before re adjusting the mixed water temperature carry out the following checks All in line or integral filters are clean Any in line or integral non return valve...

Page 9: ...months as a minimum 9 TMV Cleaning Instructions Most domestic water supplies contain calcium which will separate out when the water is heated in a system The degree and speed of scaling may vary depe...

Page 10: ...ease components Please ensure that the grease is WRAS approved Remove the O ring Clean the valve body and headwork using a propriety de scaler Thoroughly rinse the body and headwork in clean water Car...

Page 11: ...12 month guarantee of the ART 33 TMV The guarantee offered covers manufacturing material defects The guarantee will be void should the product not have been fitted and maintained as per Albion Valves...

Page 12: ...you can rest assured that if it comes from Albion it has been designed and manufactured to deliver optimum performance and is accredited with the necessary approvals Our in house quality department a...

Reviews: