6. Mix the adhesive as per the manufacturer's instructions and apply a liberal coating to the
nylon cord fabric and the rough surfaces of the inlay rubber segments. Allow pieces to
dry to the touch (about 15 to 20 minutes) and apply a second coating. Allow to set until
tacky. Place the inlay segments into position and, using a rubber or rawhide mallet and
a steel buckler, impact the entire area of the patch repeatedly. A high degree of impact
ensures proper adhesion. Clamping is not acceptable. Allow the cement to cure
thoroughly (1-
1
/
2
to 2 hours) before moving the curtain.
7. Finally, raise the curtain to an open position, re-insert it into the guides, close and re-bolt
the guides, and resume normal operation.
Figure 31
Figure 32
Service & Repair
Summary of Contents for RCA L
Page 1: ...RCA L Version 1 0 RCA L Owner s Manual ...
Page 2: ...RCA L Version 2 0 2 1 2 3 3 4 5 6 7 Safety 8 7 Components ...
Page 28: ...RCA L Version 2 0 28 6 4 2 Operator Troubleshooting Service Repair ...
Page 29: ...RCA L Version 2 0 29 Service Repair ...
Page 32: ...RCA L Version 2 0 32 6 5 4 Replacing the operator brake band Service Repair ...
Page 33: ...RCA L Version 2 0 33 6 5 5 Adjusting the operator brake band Service Repair ...
Page 36: ...RCA L Version 2 0 36 RCA L Architectural Up to including 12 x 12 ...
Page 37: ...RCA L Version 2 0 37 RCA L Architectural Over 12 x 12 ...