17
Manual #001449
Version 4.2
Maintenance Schedule
Due to the unique design features of your new
"RE-COIL-AWAY
", the need for continual mainte-
nance normally associated with conventional door systems (i.e.: guide rollers, hinges, door track,
etc.) is virtually eliminated. The limited maintenance procedures listed below, when completed as
indicated, will assure many years of trouble-free operation.
MAINTENANCE
PROCEDURE
INITIAL
1,500 CY-
CLES
EVERY 25,000
CYCLES OR 3
MONTHS
EVERY 100,000 CYCLES
OR 12 MONTHS
LUBRICATE:
Flange Bearing (4)
Drive Chain
NO
NO
NO
OIL
Grease, 1 shot
OIL
ADJUSTMENTS:
(check & adjust if neces-
sary)
Drive Chain Tension
Guides, bottom bar &
header assembly for
rust or damage
Guide Opening 1/2"
All Fasteners (check
for tightness)
Limit Settings
Reversing Edge
(check for proper op-
eration and any signs
of damage)
YES
YES
NO
YES
YES
YES
YES
YES
YES
YES
YES
EVERY MONTH
YES
YES
YES
YES
YES
YES
Summary of Contents for PosiDrive M&I
Page 10: ...9 Manual 001449 Version 4 2 Activation Repair Replacement ...
Page 11: ...Rev 4 9 2010 Manual 001449 10 High Speed Doors Operation ...
Page 12: ...11 Manual 001449 Version 4 2 ...
Page 13: ...Rev 4 9 2010 Manual 001449 12 High Speed Doors Operation ...
Page 17: ...Rev 4 9 2010 Manual 001449 16 High Speed Doors Operation ...
Page 20: ...19 Manual 001449 Version 4 2 M I Re Coil Away Architectural Over 12 x 12 Balanced ...
Page 22: ...21 Manual 001449 Version 4 2 M I Re Coil Away Architectural Over 12 x 12 Unbalanced ...
Page 24: ...23 Manual 001449 Version 4 2 M I Re Coil Away XL Architectural Over 24 x 27 ...
Page 28: ...27 Manual 001449 Version 4 2 ...
Page 29: ...Rev 4 9 2010 Manual 001449 28 High Speed Doors Operation ...