![Alasking AH-500R Installation & Operation Manual Download Page 9](http://html1.mh-extra.com/html/alasking/ah-500r/ah-500r_installation-and-operation-manual_2888993009.webp)
- 6 -
於天花板與吊頂天花板
℃
2.3
.
the unit body.
to
product
. If not
,
not install the
gas or other
part of the
unit
Installation Safety Instructions:
Caution
.The product must be mounted on the wall that
ensure th wall must be reinforced properly.
.Abnormal sound and resonance may occur due to i
installation of
.To prevent condensed water from flowing backwards to bathroom, the pipe connected
outside of the bathroom must be slanted.
.Install the pipe cap on the external wall. We recommend you purchase the pipe cap provided
to prevent the blast volume of circulation/air change decreases and abnormal sound occurs.
1
can support the weight of the
e
2
mproper
3
4
.The product must not be located immediately below the water heater and do
product in places with temperature more than 40 .
.Please set vent or use shutter for circulation and air change.
.Don t make transformation to this product.
.Don t install the product as the method which is not approved in the instruction.
10.Do not install onto slanting ceiling. Please make sure the product installed horizontally and
at the bottom of the ceiling.
11.Make sure to avoid the back-flow of gas into the room from the open flue of
open-fire appliances.
12.Disconnect power source before working on the unit to avoid receiving an electric shock.
13.Once gas leaks do not start any function of this product.
14.In order to avoid overheating and product failure, do not cover the heating
15.Do not install the product immediately below a socket inlet .
16.Do not use any device that switches the product on automatically, otherwise, it may damage
the product and catch fire.
6
7
8
'
9
'
.
.
5 The appliance is to be installed (on the ceiling or on the integrated suspended ceiling)
so that the blades are more than 2.3m above the floor.
Summary of Contents for AH-500R
Page 2: ......