1.
First remove the Cross- Screw from the
bottom of the Control Stick Assembly.
DO NOT
remove the screws that fasten the two housings
halves together (See Figure 13).
2.
Next holding the housing, fully shift the
Handle in the Control Stick Assembly to expose
the female-threaded end of the Plunger Rod (See
Figure 14).
3.
Then while holding the Handle to expose
the Plunger Rod, thread the Threaded Bead of
the Cable into the end of the Plunger Rod and
tighten securely. Release the Handle, allowing
the Cable to pull into the Control Stick Assembly
(See Figure 15)
4.
Once Cable is attached to Plunger Rod,
move the handle to pull conduit sleeve up and
into the control stick assembly (See Figure 16)
The Conduit Sleeve has a groove in it that should
align with the cross screw (See Figure 16)
5.
Reinstall the Cross Screw making certain
that the cross screw and conduit sleeve groove
are in alignment. Tighten the cross screw
securely (See Figure 17)
Control Stick
Assembly
Cross-Screw
Figure 13
Control Cable Connection to Control Stick Assemblies:
Control Valve & Valve Controls Installation - Remote Cables