![Alamo INTERSTATER Operator'S Manual Download Page 164](http://html1.mh-extra.com/html/alamo/interstater/interstater_operators-manual_2888336164.webp)
MAINTENANCE
INTERSTATER 03/09
Maintenance Section 5-10
© 2009 Alamo Group Inc.
MAINTENANCE
Inboard (Drive) Bearing
1.
Remove spring from idler arm.
Fig. Mnt-FL-
0013
2.
Remove motor mounting bracket fasteners, at
the cutterhousing. Pivot motor- mounting
bracket
3.
Remove fasteners that secure pulley to
cuttershaft. Remove pulley and key.
4.
Remove fasteners securing inboard bearing
and housing assembly to cutter- housing, then
remove bearing and housing assembly. Refer
to
Mnt-FL-0011
NOTE: There are two tapped holes in the housing
which can be used to pull bearing and housing
assembly out by using special tool No. 701627.
5.
Using a jack to align parts, install inboard
bearing and housing assembly to cutter unit.
Grease bearing and install cap over fitting.
6.
Reinstall key and pulley. Secure with
cuttershaft fasteners.
7.
Remove jack and check shaft rotation. Reinstall
knives which were removed.
8.
Reinstall drive belts then secure motor
mounting bracket to cutterhousing.
9.
Reinstall idler arm spring.
10. Reinstall belt guard.
11. Remove supports, lower unit to ground and test
unit.
12. Reinstall outboard fender, if not already
installed.
CUTTERSHAFT REPLACEMENT
NOTE: It is recommended that cuttershaft bearing and housing assemblies be replaced when replacing cutter-
shaft.
1.
Place unit on the ground or securely support at a convenient height.
2.
Remove cuttershaft bearing and housing assemblies as outlined in Paragraph "E", above. After removing
both assemblies, the cuttershaft can be removed and a new one installed. It may be necessary to remove
two sets of knives nearest the drive end of cuttershaft.
3.
Install new bearing and housing assemblies as outlined in Paragraph "E".
Summary of Contents for INTERSTATER
Page 5: ...SEASONAL CLUTCH MAINTENANCE 5 27 Proper Torque for Fasteners 5 28 ...
Page 6: ......
Page 9: ...Safety Section 1 1 2009 Alamo Group Inc SAFETY SECTION ...
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ...Introduction Section 2 1 2009 Alamo Group Inc INTRODUCTION SECTION ...
Page 85: ...Assembly Section 3 1 2009 Alamo Group Inc ASSEMBLY SECTION ...
Page 94: ...ASSEMBLY INTERSTATER 03 09 Assembly Section 3 10 2009 Alamo Group Inc ASSEMBLY ...
Page 111: ...Operation Section 4 1 2009 Alamo Group Inc OPERATION SECTION ...
Page 154: ......
Page 155: ...Maintenance Section 5 1 2009 Alamo Group Inc MAINTENANCE SECTION ...
Page 183: ......
Page 186: ...INTERSTATER SOM 03 09 Printed in USA P N 803213C ...