![Alamo INTERSTATER Operator'S Manual Download Page 162](http://html1.mh-extra.com/html/alamo/interstater/interstater_operators-manual_2888336162.webp)
MAINTENANCE
INTERSTATER 03/09
Maintenance Section 5-8
© 2009 Alamo Group Inc.
MAINTENANCE
ROLLER BEARING REPLACEMENT
Securely support mower while removing and installing roller assembly.
1. Remove roller and both bearing and bracket assemblies from mower. Lift the mower only high enough to
remove the roller assembly. If installing a roller with pre assembled bearing and bracket assemblies,
remove the old roller, proceed to step 11.
2. Slide bearing and bracket assemblies off each end of roller. If replacing with new bearing and bracket
assemblies, proceed to step 9.
3. Remove roller bearing and housing assembly attaching hardware. Remove assembly from bracket.
Inspect seal between assembly and bracket for brittleness, cracks, wear and tear. Replace if necessary. If
replacing with new roller bearing and housing assemblies, proceed to step 8.
4. Remove grease fitting from the top of bearing housing.
5. Remove bearing form housing. By Rotating Bearing 90deg.
sideways and line up with notches in Bearing
Housing: then pull out.
6. Install new bearing into housing. Bearing must be installed with grease hole in bearing aligned with grease
fitting hole in housing.
7. Reinstall grease fitting to housing. Grease fitting must be tight and seated in grease hole in bearing to
prevent bearing from rotating in housing.
8. Attach roller bearing and housing assembly to bracket with seal between housing and bracket.
9. Slide bearing and bracket assemblies on each end of roller.
10. Check bearing for proper installation in housing by gently rocking bearing and bracket assembly in end of
roller. Play should be slight to none at all.
11. Install roller and bearing and bracket assemblies on mower.
12. Lubricate roller bearing until lubricant can be seen coming out between roller and bearing housing.
Summary of Contents for INTERSTATER
Page 5: ...SEASONAL CLUTCH MAINTENANCE 5 27 Proper Torque for Fasteners 5 28 ...
Page 6: ......
Page 9: ...Safety Section 1 1 2009 Alamo Group Inc SAFETY SECTION ...
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ...Introduction Section 2 1 2009 Alamo Group Inc INTRODUCTION SECTION ...
Page 85: ...Assembly Section 3 1 2009 Alamo Group Inc ASSEMBLY SECTION ...
Page 94: ...ASSEMBLY INTERSTATER 03 09 Assembly Section 3 10 2009 Alamo Group Inc ASSEMBLY ...
Page 111: ...Operation Section 4 1 2009 Alamo Group Inc OPERATION SECTION ...
Page 154: ......
Page 155: ...Maintenance Section 5 1 2009 Alamo Group Inc MAINTENANCE SECTION ...
Page 183: ......
Page 186: ...INTERSTATER SOM 03 09 Printed in USA P N 803213C ...