![Alamo Industrial A-Boom Operator'S Manual Download Page 135](http://html1.mh-extra.com/html/alamo-industrial/a-boom/a-boom_operators-manual_2888363135.webp)
OPERATION
A-BOOM 03/09
Operation Section 3-39
©2009 Alamo Group Inc.
OPERA
TION
Many varied objects, such as wire, cable, rope, or chains, can become entangled in the
operating parts of the mower head. These items could then swing outside the housing at
greater velocities than the blades. Such a situation is extremely hazardous and could result
in serious injury or even death. Inspect the cutting area for such objects before mowing.
Remove any like object from the site. Never allow the cutting blades to contact such items.
(SGM-06)
BuzzBar
®
Tree Limb Cutter
•
The BuzzBar Tree Limb Cutter is rated for
material up to 4” in diameter.
•
Suggested cutting Speed for the Buzzbar is 1st
gear. Slow down for thick, dense, or hard
material.
•
Always cut with the boom positioned
perpinducular to the limbs being cut (see
diagram). Cutting with the boom swing
backward or forward will cause the blades to
warp from “raking” through the cut material.
•
For maximum blade life, do not allow the
blades to contact hard items such as the
ground or metal objects.
•
Check belt tension daily.If belts start to slip
adjust tension soon. The more belt slippage,
the more they will wear and looser they
become.
•
Grease bearings of saw blade spindles daily.
•
Two pumps from hand grease gun.
•
When operating the unit be sure there are no
bystanders or animals with in 100 yards of the
unit
.
OPS-B- 0043
Summary of Contents for A-Boom
Page 7: ...Safety Section 1 1 2009 Alamo Group Inc SAFETY SECTION...
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ...Introduction Section 2 1 2009Alamo Group Inc INTRODUCTION SECTION...
Page 97: ...Operation Section 3 1 2009 Alamo Group Inc OPERATION SECTION...
Page 145: ...Maintenance Section 4 1 2009 Alamo Group Inc MAINTENANCE SECTION...
Page 161: ......