![Alamo Industrial A-Boom Operator'S Manual Download Page 120](http://html1.mh-extra.com/html/alamo-industrial/a-boom/a-boom_operators-manual_2888363120.webp)
OPERATION
A-BOOM 03/09
Operation Section 3-24
©2009 Alamo Group Inc.
OPERA
T
ION
8.OPERATING THE CONTROL VALVES
The A-Boom has two control valves. One is the on-off switch to the cutter motor and the other is the position
control valve.
ON-OFF Switch (Mower Valve) - To operate the mower, pull the switch while the tractor is running. The push-
pull operator will remain in the ON position PULLED or the OFF position PUSHED until the operator desires
to start or stop the mower. Always start the cutterhead with the tractor at idle.
The operator should not leave his seat with this valve engaged or with the tractor engine running.
Allow approximately 60 seconds for the blades to come to rest after turning the switch off before
dismounting.
The mower valve comes with a push-pull operator switch that, when properly installed, will prevent the tractor
from starting if the switch is in the ON position (pulled out). To properly install the push-pull operator, follow the
wiring diagram shown. Failure to properly install this switch could result in injury to the operator or bystander.
OPS-B- 0030_B
Operate the Tractor and/or Implement controls only while properly seated in the Tractor seat
with the seat belt securely fastened around you. Inadvertent movement of the Tractor or
Implement may cause serious injury or death.
(SG-29)
Summary of Contents for A-Boom
Page 7: ...Safety Section 1 1 2009 Alamo Group Inc SAFETY SECTION...
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ...Introduction Section 2 1 2009Alamo Group Inc INTRODUCTION SECTION...
Page 97: ...Operation Section 3 1 2009 Alamo Group Inc OPERATION SECTION...
Page 145: ...Maintenance Section 4 1 2009 Alamo Group Inc MAINTENANCE SECTION...
Page 161: ......