
7
3910832
Subject to changes in keeping with technical developments!
2.6
Duties of the operating company
The operator of the AL-KO products must regularly train his staff with regard to the following:
Adherence to and use of the operating and installation instructions as well as the legal regulations.
Appropriate operation of the air heater / air cooler.
Adhere to the instructions of the company security and the operating instructions of the operating company as re-
quired.
Conduct in emergencies
2.7
Disposal of the packaging
Disposal of the packaging must be performed according to the currently valid, local environmental and
recycling regulations of your country and your municipality.
"Safety information"