
Translation from the original operating instruction
30
AL-KO AIR HEATER / AIR COOLER INDUSTRY
5. Assembly
Warning!
Installation, electrical connection, media supply connection, maintenance, commissioning, repair, etc. may only
be performed by trained staff.
The place of installation as well as the installation structure must provide permanent and vibration-free support of
the devices.
The place of installation and the installation structure has to be checked by a structural engineer, if required.
AL-KO air heaters / air coolers are delivered in pre-assembled form.
The manufacturer documentation must be considered before installation or removal.
The air heaters / air coolers must be levelled during installation!
Air heaters with electric heating element series LH ... EL: It is urgent to ensure that all sides are sufficiently far away
from flammable materials.
5.1
Wall-mounting the devices
Attach the bracket set to the air heater / air cooler when it was not pre-installed by the factory.
Drill fastening holes into the wall.
Attach the air heater / air cooler to the wall.
Example for wall mounting:
1
Bracket K for wall/ceiling mounting
1
Mixed air box MLK
2
LH IND Type NF air heater
2
LH IND Type NF air heater
3
KFM bracket for wall mounting
Fig.: Wall-mounting the air heater
Fig.: Wall-mounting LH with mixed air box