![AKM AKD4629-A Manual Download Page 2](http://html1.mh-extra.com/html/akm/akd4629-a/akd4629-a_manual_2886274002.webp)
[AKD4629-A]
<KM101901>
2011/01
Evaluation Board Manual
Operation sequence
1) Set up the power supply lines.
(1-1) In case of using separate power supply lines <Default>
Set up the jumper pins.
JP82
AVDD
JP83
DVDD
JP84
TVDD
REG JACK REG JACK REG JACK
Set up the power supply lines.
Name Color Voltage
Comments
Attention
+12V
Red
+12V
Regulator, Power Supply for Op-amp
Should be connected.
-12V
Red
-12V
Power Supply for Op-amp
Should be connected.
AVDD
Orange
+5V
Power supply for AVDD of the AK4629
Should be connected.
DVDD
Orange
+5V
Power supply for DVDD of the AK4629
Should be connected.
TVDD
Orange
+5V
Power supply for TVDD of the AK4629
Should be connected.
AGND
Black
0V
Analog ground
Should be connected.
DGND
Black
0V
Digital ground
Should be connected.
Table 1 Set up of power supply lines
(1-2) In case of using the regulator
Set up the jumper pins.
JP82
AVDD
JP83
DVDD
JP84
TVDD
REG JACK REG JACK REG JACK
Set up the power supply lines.
Name Color Voltage
Comments
Attention
+12V
Red
+12V
Regulator, Power Supply for Op-amp
Should be connected.
-12V
Red
-12V
Power Supply for Op-amp
Should be connected.
AVDD
Orange
+5V
Power supply for AVDD of the AK4629
Should be open.
DVDD
Orange
+5V
Power supply for DVDD of the AK4629
Should be open.
TVDD
Orange
+5V
Power supply for TVDD of the AK4629
Should be open.
AGND
Black
0V
Analog ground
Should be connected.
DGND
Black
0V
Digital ground
Should be connected.
Table 2 Set up of power supply lines
2) Set up the evaluation mode, jumper pins.
(See the followings)
3)
Power
on.
The AK4629 and AK4118 should be reset once bringing SW1 “L” upon power-up.