10.2 Installation
When installing the tank, ensure sufficient clearance
from walls and other objects to enable the connection
pipes to be fitted.
IMPORTANT
Do not exceed the operating pressures spec-
ified on the rating plate.
NOTE
Close off any connections not required with
appropriate plugs or caps.
Position of the connections: "Dimensional draw-
ings“, from page 8, for the respective model
10.3 Installation of the sensor(s)
1. On site, install the sensor(s) included included in
the scope of delivery for the heating and heat pump
regulator in the sensor pocket(s) provided.
Position:
"Dimensional
drawings“,
from
page 8, for the respective model.
2. Connect the sensor(s) to the regulator according
to the terminal diagram.
Terminal diagram for the respective model in the
heat pump operating manual
11
Insulation of the connections
and the storage tank
NOTE
Insulate in accordance with applicable local
standards and directives.
1. Check seals of all hydraulic connections. Conduct
pressure test.
2. Insulate all connections, pipes and cables.
IMPORTANT
The insulation of TPSK-/WTPSK tanks of the
connections and lines must be moistureproof.
12
Draining the storage tank
IMPORTANT
When draining the storage tank, always en-
sure adequate ventilation.